Kilshinahan Timoleague Co. Cork

UNCONDITIONAL

Planning application 12/5340

Cork - Cork County Council

Proposed Development

Dwellinghouse, extension of duration to permission granted under planning reg 07/5267

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jun 2012

  2. Decision due

    14 Aug 2012

  3. Decision: UNCONDITIONAL

    14 Aug 2012

Application Details

Location
Kilshinahan Timoleague Co. Cork
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Cork County Council

Timeline

Registration Date
20 June 2012
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
14 August 2012

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
07/5267CONDITIONAL21 Feb 2007

Dwellinghouse

Kilshinahan Timoleague

3m
07/4380INCOMPLETED APPLICATION23 Jan 2007

Dwellinghouse

Kilshinahan Timoleague

376m
07/4775WITHDRAWN6 Feb 2007

Dwellinghouse

Kilshinahan Timoleague

376m
04/6247REFUSED16 Aug 2004

Dwellinghouse

Kilshinahan Timoleague

423m
21/4496UNCONDITIONAL26 Feb 2021

A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 8.6 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV, and all associated ancillary development works. - Extension of duration of permission granted under planning reference: 15/6968

Kilshinahan Timoleague Co. Cork

423m
15/6968CONDITIONAL23 Dec 2015

A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 8.6 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV, and all associated ancillary development works.

Kilshinahan Timoleague Co. Cork

424m
25/6532Grant with Conditions20 Nov 2025

A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15sqm), 1 no. single storey delivery station (53sqm), 2 no. single storey spare parts storage containers (15sqm each), security fencing, CCTV, landscaping and all other ancillary development works. The solar panels will be arranged within a developable area of approximately 8.6 ha at Kilshinahan, Timoleague, Co. Cork. The proposed development will consist of the construction and completion of the solar farm as permitted by and commenced under Planning Permission Ref. 15/6968, extended by Ref. 21/4496 and modified by Ref. 22/6452, with proposed minor changes to that which was permitted to the site layout, as shown in the permitted site layout drawings (Drawing Ref. No.s 4332_2005_A, 4332_2006_A and 4332_2007_A), including array arrangement and internal track route, and minor changes to the fence alignment along the north west boundary; and the addition of a second single storey spare parts storage container (15sqm) (2 no. single storey spare parts storage containers in total). It is anticipated that works under the extant planning permissions will commence with the approved site clearance works, access roads and temporary internal tracks/roads, fencing and gates, and the proposed development will incorporate those works and such further construction and completion of the solar farm as modified by the proposed grant of planning permission the subject of this application. A 2-year permission is sought, with works expected to commence in Q1 2026 under the extant permissions and this permission is sought to secure the completion of the solar farm development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Kilshinahan, Timoleague, Co. Cork

424m
22/6452CONDITIONAL28 Oct 2022

Modification to the solar farm permitted under planning reg no. 15/6968 and extended under 21/4496. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, changes to the design of the delivery station, change to permitted fencing type and associated layout changes. All modifications within the boundary of the permitted development.

Kilshinahan Timoleague Co. Cork

572m
26/1372Grant with Conditions22 May 2026

A 10-year permission for the construction of a battery energy storage system (BESS) facility consisting of two single-storey BESS units, two single-storey power conversion system (PCS) units, a single storey transformer station, underground cabling connecting the BESS to the permitted substation within the solar PV farm( permitted under Planning Ref. No. 25/6532) security fencing and gate, acoustic barrier and all other ancillary site development Kilshinahan, Timoleague, Co. Cork. The BESS facility will be arranged within a site area of approximately 0.043ha co-located within the development boundary of the permitted solar PV development, Planning Ref. No. 25/6532. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.

Kilshinahan, Timoleague, Co. Cork

654m
07/5614CONDITIONAL2 Mar 2007

Construction of roofed structure to house cattle to include slatted unit, effluent tank, extension to existing silage yard and associated site works

Kilshinahan Timoleague

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?
Kilshinahan Timoleague Co. Cork - Planning Application 12/5340 | Permission.ie