← Back to search

ESK South Lyre Banteer Co. Cork

CONDITIONAL

Planning application 12/5434

Cork - Cork County Council

Proposed Development

Construction of a slatted beef unit and machinery shed

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Jul 2012

  2. Decision: CONDITIONAL

    22 Aug 2012

  3. Decision due

    27 Aug 2012

  4. Grant issued

    27 Sept 2012

Application Details

Location
ESK South Lyre Banteer Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
2 July 2012
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
22 August 2012
Grant Date
27 September 2012

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
06/6719CONDITIONAL27 Apr 2006

Slatted beef unit, silage base and concrete yard

Esk South Lyre Banteer

64m
07/12110CONDITIONAL2 Nov 2007

Demolition of existing dwelling and construction of two-storey dwelling and septic tank

Esk South Lyre Banteer

282m
03/5748CONDITIONAL19 Nov 2003

Bungalow and garage

Esk South Lyre Banteer

527m
11/5276CONDITIONAL13 Jun 2011

Windfarm to consist of [a] the provision of a total of 12 no. wind turbines with a maximum ground to top blade tip height of up to 126 metres, [b] upgrading of existing and provision of new internal access roads, [c] provision of a wind anemometry mast (85 metres in height), [d] 2 no. borrow pits, [e] an electricity sub-station with control room (as previously approved under Planning Reg. No. 11/4242), and [f] associated equipment and all ancilary site and facilitating works to existing road junctions.

Esk North, Esk South Derrygowna, Monanveel Glanminnane Millstreet/Mallow

638m
05/1856CONDITIONAL24 Mar 2005

Dwellinghouse

Monanveel Nad Banteer

681m
08/8814INCOMPLETED APPLICATION9 Sept 2008

Retention of canopy to front and single storey extensions to rear and side of dwellinghouse, detached shed and wastewater treatment system

Monanveel Nad Banteer Mallow

681m
08/8662INCOMPLETED APPLICATION1 Sept 2008

Retention of extensions to rear and side of dwelling, canopy to front of dwelling, shed to the rear and wastewater treatment system

Monanveel Nad Banteer Mallow

682m
08/9136CONDITIONAL2 Oct 2008

Retention of canopy to front and single storey extensions to rear and side of dwellinghouse, detached domestic shed and wastewater treatment system

Monanveel Nad Banteer Mallow

689m
10/4547INCOMPLETED APPLICATION9 Mar 2010

Changes to the permitted ESK wind farm development (planning ref. nos. 02/2553 and 08/6703) to include: a reduction in the number of permitted wind turbines from seven down to four; an increase in the hub height of the remaining four turbines from 55m hub height, 55m rotor blade diameter to 80m hub height, 93m rotor blade diameter; changes to the locations of wind turbines, changes to the wind farm roads and associated works.

ESK South Nad Banteer

692m
11/4242CONDITIONAL9 Feb 2011

Alterations to the permitted substation compound, control building and the compound boundaries permitted under Pl. Reg. Nos. 02/2553 and 08/6073. This will include an increase in the overall area of the compound from the permitted 23metres x 26metres to the proposed 20metres x 35metres, an increase in the control building from the permitted 8.6 metres x 5 metres to the proposed 13 metres x 6.5 metres, additional switch yard gear, new road layout within substation, ducting, cabling and associated site works

ESK South Nad Banteer Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?