Proposed Development
Construction of a one and a half storey dwelling house with detached double garage, modifications to existing site entrance, waste water treatment system and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
3 Aug 2012
Decision due
27 Sept 2012
Application Details
- Location
- Coolvallanane Beg Kinsale
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 3 August 2012
- Status
- WITHDRAWN
- Decision
- Pending
- Decision Due
- 27 September 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a double storey house with detached double garage, driveway, on-site waste treatment system with percolation area, on-site stormwater soakaway, a new well, and also carry out all associated site works
Coolvallanane Beg Kinsale Co. Cork
Retention of private swimming pool
COOLVALLANANE BEG, COOLVALLANANE BEG,
Retention of conversion of garage and attic space to living area and storage with rear rooflight to the south of existing dwelling, retention of extension to the north of existing dwelling and permission to replace existing septic tank with a treatment unit and percolation area with associated site works
Coolvallanane Beg Kinsale
Permission for retention of conversion of garage and attic space to living area and storage with rear roof light to the south of the existing dwelling, retention of extension to the north of the existing dwelling and permission to replace existing septic tank with a treatment unit and percolation area.
Coolvallanane Beg Kinsale Co. Cork
Permission for retention of conversion of garage and attic space to living area and storage with rear roof light to the south of the existing dwelling and permission to replace existing septic tank with a treatment unit and percolation area with associated site works
Coolvallanane Beg Kinsale Co. Cork
(1) Permission for the construction of a new extension to the side of a dwelling house and associated site works. (2) Retention planning permission for the following alterations and extensions to the same existing dwelling house and associated site works: (a) Retention of the construction of a rear extension, (b) Retention of the construction of a front annex, hallway extension with new front door, (c) Retention of associated alterations to the front of the dwelling house including the blocking up of the existing front door, resizing of window openings and the removal of decorative arches to the front elevation, (d) Retention of the replacement of a side window with a patio door, (e) Retention of the insertion of a new window in the side elevation, (f) Retention of all associated site works.
Coolvallanane Beg Kinsale Co. Cork
Retention of dwellinghouse, site boundaries and associated site works (alterations to permission granted under planning reference S/72/83)
Coolvallanane Beg Kinsale
Extension to front of existing dwelling for use as granny flat, extension to rear of existing dwelling and upgrading of existing treatment system to a proprietary waste water treatment unit.
Coolvallanane Beg Kinsale
Construction of extensions to rear and front of existing dwelling. Extension to front to be used as a granny flat. Upgrade existing treatment unit to proprietary waste water treatment unit and associated site works
Coolvallanane Beg Kinsale Co. Cork
Alterations and construct extensions to rear and front of existing dwelling. Extension to front to be used as a granny flat. Upgrade existing treatment unit to proprietary waste water treatment unit and associated site works
Coolvallane Beg Kinsale Co Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?