Proposed Development
Construction of 103no. car parking spaces and associated site works
Application Timeline
Application received
15 Aug 2012
Decision: CONDITIONAL
21 Sept 2012
Decision due
9 Oct 2012
Grant issued
30 Oct 2012
Application Details
- Location
- IDA Business & Technology Park Anngrove and Killacloyne Carrigtohill Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 August 2012
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 September 2012
- Grant Date
- 30 October 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of the existing external canopy and stairs to the east of the existing 2-storey admin building; construction of a 2-storey extension linking the existing 2-storey admin building with the existing 3-storey packaging building, to provide an extended canteen area, additional offices, and cleanroom; rooftop plant, including new screen over the existing and proposed rooftop plant rooms, and a roof cat ladder; and modifications to the internal road network to the south of the proposed development to allow for vehicle circulation. The proposed development will also include the provision of 9no. new accessible parking spaces within the existing car park, and the construction of an extension to the west of the existing car park to provide an additional 137no. car parking spaces, (including 14no. electric vehicle spaces as well as chargers), as well as new lighting, an internal pedestrian and vehicular link to the existing car park, and a new access from the existing internal IDA Business & Technology Park road; new waste compound area; all site development, drainage and landscaping works.
Gilead Sciences Ireland UC, IDA Business & Technology Park Anngrove, Carrigtwohill Co. Cork
Construct a new two storey annex with fire escape stairs to the western elevation of an existing manufacturing building, together with the development of an access road for the relocated Intermediate Bulk Container Bund, at the plant facility in Carrigtwohill, including associated ancillary site works. The ground floor will consist of a cleanroom to be utilised for the operation of small batch product packaging operations and the first floor will be utilised to house plant and equipment associated with ground floor cleanroom. Site works will include the relocation of existing Gas Bottle Storage, as well as relocation of an existing Aco channel drain servicing the external yard area. Demolitions and alterations to the existing western facade are required to tie the new structure into the existing building
IDA Business & Technology Park Anngrove Carrigtwohill Co. Cork
The construction of a new warehouse (5,176m2) which incorporates a 3 storey area over the loading bays, a two storey connection corridor to the existing building (970m2), a site security building (110m2), a logistics yard, a contractor compound, an extension to the existing staff carpark and an access road on the western boundary of the existing site. Works will include required alterations to the existing internal layout, all necessary demolitions and modifications as well as all associated site development works, including a new surface water connection to the existing industrial estate infrastructure, internal roads, retaining structures, plant areas, pedestrian foot paths, modifications to the site boundary fence line and new vehicular access barriers
Gilead Sciences Ireland UC IDA Business & Technology Park Anngrove, Carrigtwohill Co.Cork
The construction of, at our existing facility in the townlands of Anngrove and Killacloyne, Carrigtwohill, co. Cork, a new warehouse (5,176m2) which incorporates a 3 storey area over the loading bays, a two storey connection corridor to the existing building (970m2), a site security building (110m2), a logistic yard, a contractor compound, an extension to the existing staff carpark and an access road on the western boundary of the existing site. Works will include required alterations to the existing internal layout, all necessary demolitions and modifications as well as all associated site development works, including a new surface water connection to the existing industrial estate infrastructure, internal roads, retaining structures, plant areas, pedestrian foot paths, modifications to the site boundary frnce line and new vehicular access barriers
Gilead Sciences Ireland UC IDA Business & Technology Park Anngrove & Killacloyne, Carrigtwohill Co.Cork
To construct a new annex to the Western elevation of an existing manufacturing backbone building at the plant facility including associated ancillary site works.
IDA Business & Technology Park Anngrove Carrigtwohill Co. Cork
Retention of 2.4m high security fence to site perimeter
IDA Business & Technology Park Anngrove and Killacloyne Carrigtohill
Single storey waste management building as part of drainage upgrade works
I.D.A. Business & Technology Park Anngrove Carrigtwohill
Construction of a new two storey bin washer centre extension to the north elevation of the existing manufacturing building consisting of a new bin washer centre at ground floor with walk-on-ceiling above and plant and equipment room at first floor level. Works include alterations to existing internal layout including all necessary demolitions and modifications as well as all associated site development works including diversion of existing and process water drainage, new surface water and process water draining tie-ins, demolition of existing external ramp, modifications to external stair, new pedestrian paths and vehicular safety barrier.
Gilead Sciences Ireland UC IDA Business & Technology Park Anngrove, Carrigtwohill Co. Cork
Construction of production/warehouse building, two storey production/packaging building to include first floor plant room areas, construction of two storey Backbone building extension, construction of roof mounted items of plant and equipment, yard and docking areas, construction of louvre shading to existing south office elevation, modifications to existing car parking and landscaped areas, provision for total of 447 no. car parking spaces built on phased basis, alterations to internal roads system, revised fencing, gates, landscape modifications to include new berms and miscellaneous works and associated site works and services
Carrigtwohill Business Pk Anngrove Carrigtwohill
Single storey utility building & associated works