← Back to search

Tullagreen Carrigtohill

CONDITIONAL

Planning application 13/4034

Cork - Cork County Council

Proposed Development

Retention of site security fencing and associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Jan 2013

  2. Decision: CONDITIONAL

    18 Feb 2013

  3. Decision due

    7 Mar 2013

  4. Grant issued

    26 Mar 2013

Application Details

Location
Tullagreen Carrigtohill
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
11 January 2013
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 February 2013
Grant Date
26 March 2013

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

46m
25/4938Conditional Permission20 May 2025

Permission for the construction of an electrical compound and associated site development works. The proposed electrical compound will include an ESB control building, Merck customer building, 2 no. 38kV transformers and all ancillary bunds, equipment, access roads, lighting and fencing. The proposed development is for a new build on an existing manufacturing establishment site to which the Major Accident Directive applies. The Natura Impact Statement will be submitted to the Planning Authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority. The establishment holds an Industrial Emissions Licence that is regulated by the Environmental Protection Agency (EPA). Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.

Tullagreen Carrigtohill Co. Cork

55m
13/5177CONDITIONAL20 Jun 2013

Construction of 114no. carpark spaces to the East of the existing carpark, and Retention of 133no. carpark spaces to the South of the existing car park & associated site works

Tullagreen Carrigtohill Co.Cork

66m
23/5585INCOMPLETED APPLICATION3 Aug 2023

Permission for the construction of a single storey ESB switch room building, single vehicle park space, pedestrian paths and ramps

Tullagreen Carrigtohill Co.Cork

66m
23/5751CONDITIONAL29 Aug 2023

Permission for the construction of a single storey ESB switch room building, single vehicle park space, pedestrian paths and ramps. The proposed development is for a new build on an existing manufacturing establishment site to which the Major Accidents Directive applies. The proposed development site is subject to the provisions of an EPA-Industrial Emissions Directive (IE) Licence

Tullagreen Carrigtohill Co.Cork

85m
25/4007CONDITIONAL8 Jan 2025

Permission for alterations and revisions to the previously approved planning reference number 22/4839. The proposed changes include a reduction in the size of the T7 building and an expansion of the pump house footprint (total 5.6m2 increase in total floor area). Modifications to the permanent bridge are also proposed, involving adjustments to its external materials and dimensions. Site-wide landscaping updates are planned, along with the installation of high-level signage on the IC4 production building. Minor adjustments to the type, size and placement of doors and windows are proposed for the IC4 production building, central utility building, drum store and foam deluge building. The application also includes the relocation of the southeast gate and detailing of the cycle route. Finally, alterations to plant, machinery, and tanks to the IC4 production building, yard area and fire water tank areas are part of this proposal. The proposed development is located on an existing manufacturing site which the Major Accidents Directive applies. The site is also subject to both an Industrial Emissions License and an Integrated Pollution Control License, regulated by the environmental Protection Agency (EPA). A Natura Impact Statement and Appropriate Assessment Screening Report is submitted to the Planning Authority with this Application.

Tullagreen and Carrigtohill Carrigtwohill Co.Cork

93m
15/4797CONDITIONAL20 Apr 2015

Construction of an extension to the existing manufacturing building, demolition of existing personnel entrance porch, and associated site works. The extension will comprise a single storey double height space with mezzanine. Permisison is also sought for the construction of 30 additional car-parking spaces and the re-location of 15 car-parking spaces. The application relates to an establishment which holds an integrated pollution prevention and control (IPPC) licence and to which the Major Accident Regulations apply

Tullagreen Carrigtwohill

111m
12/4109INCOMPLETED APPLICATION27 Jan 2012

Construction of an expansion to the existing waste water treatment plant to include a Laboratory/Control building, an extension to the existing sludge dewatering building, an aeration tank, waste storage tanks, roads, piperacks, bunds, plinths, fencing, earthworks and associated works

Tullagreen Carrigtohill Co. Cork

111m
04/9125CONDITIONAL13 Dec 2004

Construction of first floor mezzanine within existing industrial unit, in order to expand a medical device assembly area

Tullagreen Carrigtwohill

111m
06/4900CONDITIONAL17 Feb 2006

Construction of a two storey manufacturing building, a single storey mix room extension (7.8m high) to the Hi-flow building, a thermal oxidiser, stack (14.6m high)and its associated base, cooling tower and plinth (5m high), solvent recovery unit (15m) and plinth, Drum store, an additional 100 no. carpark spaces, an extension to the existing piperack, associated site works and ancillary landscaping, the relocation of the proposed extension to existing tank farm and tank farm electrical room (MCC) previously granted under P.A. ref: S/01/5172 (change of plan), the construction of a two storey maintenance workshop as granted under P.A. ref: S/01/5172, also the retention of a small single storey water services room as an extension to the West of the Hi-flow building

Tullagreen Carrigtwohill

111m
12/6574CONDITIONAL18 Dec 2012

(1) Construction of a new two-storey extension with an area of 1695sqm for use as a membrane pilot research and development facility containing process rooms, research & development laboratories and plant areas. (2) Construction of a single storey extension of 100sqm to existing drum store, (3) Relocation of existing nitrogen tank, fire water tank and fire water pump house with an area of 31sqm (4) Relocation of existing cooling tower with concrete platform (5) Provision of 30 additional car parking spaces, and (6) Partial demolition of existing stone wall including all associated site works,

Tullagreen Carrigtwohill Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?