Dromcummer Beg Kanturk

CONDITIONAL

Planning application 13/4295

Cork - Cork County Council

Application Timeline

  1. Application received

    22 Feb 2013

  2. Decision: CONDITIONAL

    2 May 2013

  3. Decision due

    27 May 2013

  4. Grant issued

    7 Jun 2013

Application Details

Location
Dromcummer Beg Kanturk
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
22 February 2013Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 May 2013
Grant Date
7 June 2013

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

253m
10/8239CONDITIONAL18 Oct 2010

Construct a sunroom to side of dwelling together with ancillary works

Dromcummer Beg Kanturk Co Cork

253m
10/8183INCOMPLETED APPLICATION12 Oct 2010

Construction of a sunroom to side of dwelling together with ancillary works

Dromcummer Beg Banteer

378m
16/4732REFUSED1 Apr 2016

To construct new dwellinghouse and domestic garage served by a packed wastewater treatment system and polishing filter with associated site works

Dromcummer Beg Kanturk Co. Cork

406m
09/7036CONDITIONAL14 Sept 2009

Amendments to hotel and residential development granted under Pl. Reg. No.08/5550 consisting of a change of plan and design to hotel

Duhallow Park Hotel Dromcummer Beg Kanturk

467m
18/6880REFUSED1 Nov 2018

Construction of a crematorium and all associated site works and landscaping including decommissioning of existing waste water treatment system and provision of new waste water treatment system, new car parking and circulation, removal of the entrance gateposts, alterations to entrances at existing locations to create one dedicated entrance and one dedicated exit. A Natura Impact Statement will be submitted to the planning authority with the application.

The Former Duhallow Park Hotel Site Dromcummer Beg Kanturk Co. Cork

470m
14/4744CONDITIONAL14 Apr 2014

The completion of the demolition of the former hotel and associated structures and the construction of 4 no. two-storey dwellinghouses including garages, ancillary development, and all site development and landscaping works at the c.2.9ha (c.7.2 acres) site of the former Duhallow Park Hotel.

The Former Duhallow Park Hotel Dromcummer Beg Kanturk, Co Cork

655m
15/4775CONDITIONAL17 Apr 2015

Re-profiling of a 200m section along the south bank of the River Allow at Ballymaquirk/Kilcaskan South, Kanturk. The aim is to reduce excessive river bank erosion and consequent siltation to the river and protect Atlantic salmon spawning beds and freshwater pearl mussel habitat further downstream

Ballymaquirk Kilcaskan South Kanturk

795m
17/5132CONDITIONAL10 May 2017

Replacement of existing underground septic tank with overground sludge storage tank and storm water tank of maximum dimensions of 6m long. 3m wide and 3.5m high; the installation of a spiral screen and compactor; the construction of new gangway over proposed tanks; raising of existing sump pump to 1.5m above ground level and the installation of new control kiosk

Banteer Wastewater Treatment Plant Inchidaly Banteer Co. Cork

835m
16/4980CONDITIONAL27 Apr 2016

Construct slatted beef unit, dungstead and hay store and retention of a calf house

Coolacheesker Kanturk Co. Cork

846m
03/3617CONDITIONAL21 Jul 2003

Construction of precast factory & batching plant

BALLYMAQUIRK, BALLYMAQUIRK,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?