← Back to search

Ballyknock South Ballynoe Mallow Co.Cork

INCOMPLETED APPLICATION

Planning application 13/4820

Cork - Cork County Council

Proposed Development

Extensions to sides of dwelling, alterations to front elevation of dwelling, domestic detached garage incorporating domestic store, decommissioning of existing septic tank, and installation of a new sewage treatment unit and percolation area.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 May 2013

  2. Decision due

    27 Jun 2013

Application Details

Location
Ballyknock South Ballynoe Mallow Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
3 May 2013
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
27 June 2013

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
13/5044CONDITIONAL5 Jun 2013

Extension to sides of dwelling, alterations to front elevation of dwelling, domestic detached garage incorporating domestic store, decommissioning of existing septic tank and installation of new sewage treatment unit and percolation area

Ballyknock South Ballynoe Mallow

56m
19/6047CONDITIONAL16 Aug 2019

Retention of 2-storey outbuilding and store attached to existing dwelling and permission for construction of link extension and conversion of the above store and 2-storey outbuilding for use as extension to existing dwelling and installation of packaged wastewater treatment system and sand/soil percolation area

Knockacool Cottage Ballyknock South Ballynoe Mallow, Co. Cork

74m
20/5874INCOMPLETED APPLICATION28 Aug 2020

Construction of a dwellinghouse with waste water treatment unit and all associated site work

Knockacool Ballyknock South Ballynoe Mallow, Co. Cork

74m
20/6743REFUSED7 Dec 2020

Construction of a dwelling house with waste water treatment unit and all associated site works.

Knockacool Ballyknock South Ballynoe, Mallow Co. Cork

74m
20/5542INCOMPLETED APPLICATION21 Jul 2020

The construction of a dwelling house with a waste water treatment unit and all associated site works.

Knockacool Ballyknock South Ballinoe Mallow, Co. Cork

126m
20/5913INCOMPLETED APPLICATION4 Sept 2020

Retention and completion of dwellinghouse, domestic garage with first floor gym, garden shed to house pump for well, bio-treatment unit, site entrance and associated site works. (Previous planning references: 17/6258 and 12/05955).

Ballyknock South Ballynoe Co. Cork

127m
20/6173CONDITIONAL5 Oct 2020

Retention and completion of dwellinghouse, domestic garage with first floor gym, garden shed to house pump for well, bio-treatment unit, site entrance and associated site works. (Previous planning references: 17/6258 and 12/05955).

Ballyknock South Ballynoe Co. Cork

127m
20/5557INCOMPLETED APPLICATION23 Jul 2020

Retention and completion of dwellinghouse, domestic garage, garden shed to house pump for well, bio-treatment unit, site entrance and associated site works. (Previous planning references: 17/6258 and 12/05955).

Ballyknock South Ballynoe Co. Cork

127m
09/4986CONDITIONAL31 Mar 2009

One-and-a-half-storey dwelling, domestic garage, wastewater treatment unit, new vehicular entrance off existing public road & all associaated site development works

Ballyknock South Ballynoe

127m
17/6258UNCONDITIONAL31 Aug 2017

Construction of a dwellinghouse, detached garage, site entrance and new waste water treatment system along with all other associated site works - Extension of Duration to permission granted under Planning Reg. No. 12/5955

Ballyknock South Ballynoe Co.Cork-

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?