Tullyglass Enniskeane Co.Cork
INCOMPLETED APPLICATIONPlanning application 13/5065
Cork - Cork County Council
Proposed Development
Construction of cattle underpass beneath the public road and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
7 Jun 2013
Decision due
1 Aug 2013
Application Details
- Location
- Tullyglass Enniskeane Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 7 June 2013
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 1 August 2013
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a cattle underpass beneath the public road and all associated site works
Tullyglass Enniskeane Co,Cork
2 storey extension to dwelling and domestic garage
TULLYGLASS, TULLYGLASS,
Dwellinghouse, garage and associated works
Tullyglass Bandon
Construction of dwelling house, domestic garage and new entrance
Tullyglass Enniskeane Co. Cork
The existing Bandon to Dunmanway 110 kV Overhead Line (OHL), which is approximately 26km long between the existing Bandon 110kV Substation in the townland of Mishells, Co. Cork (approximately 1km north of Bandon, Co. Cork) and the existing Dunmanway 110kV Substation in the townland of Ballyhalwick, Co. Cork (approximately 0.4km east of Dunmanway Co. Cork). The existing OHL is located in the townlands of Acres, Aghalinane, Ballyhalwick, Balteenbrack, Behagh, Caher, Carhoon West, Castlelands, Derrycool, Dromidiclogh, Dromidiclogh West, Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh East, Kilnacranagh West, Laragh, Lissacroneen, Mallowgaton, Mishells, Murragh, Roughgrove East, Roughgrove West, Sranaviddoge, Teadies Upper, Toom and Tullyglass, Co. Cork. An uprate (refurbishment) of the existing Bandon to Dunmanway 110kv OHL, which consists of the : (i) replacement ("restringing") of the existing OHL conductor wires with a new higher capacity conductor including installation of a new fibre optic communication connection; (ii) replacement of 12 no. of the 13 no. existing steel towers including 11 no. angle masts (AM) and 1 no. end mast (EM) and their foundations with similar structures and member replacement and new bolts at 1 no. EM. Any replacement AMs will be constructed at, or immediately adjacent to the existing structures that they will replace, with a height difference of between 0.5-1.5m; (iii) Replacement of 16 no. of the 127 no. existing intermediate Polesets (IMPs); with similar structures. Any replacement IMPs will be constructed in situ, with the exception of IMP128 which will be replaced at an offset of 10m. The height differences of the replacements will be 1m, with the exception of IMP113 and IMP115 which will be a 2m and 3m increase in height respectively, (iv) Carrying out of civil works for tower foundation strengthening at 1 no. location; (v) Replacement of hardware and fittings at all locations, including insulators, clamps, anti-climb guards, vibration dampers, and installation of new jumper arrangements, suspension weights, plump poles, pole bolts and anti-climb guards; (vi) replacement of a crossarm at 1 no. location; (vii) all associated works within the existing Dunmanway Substation to accommodate the uprated 110 kV OHL and all associated site development works including above and below the ground works to gain access to the existing structures including timber cutting and vegetation clearance, painting, renumbering of replacement st
Acres, Aghalinane, Ballyhalwick,Balteenbrack, Behagh, Caher, Carhoon West, Castlelands, Derrycoo Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh Lissacroneen, Mallowgaton, Mishells, Murragh, Roug
Construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works
Tullyglass Enniskeane Co. Cork
To demolish existing ruined dwellinghouse, demolish existing two no. dry storage buildings, construct a cattle house with two no. slatted slurry tanks, walled silo, two no. concrete aprons, dry yard and carry out associated site works
Tullyglass Enniskeane Co. Cork
Dwelling
Tullyglass Newcestown Bandon
Construction of extension to dwellinghouse and retention of alterations to same
Tullyglass Bandon
The construction of a dwellinghouse, domestic garage, entrance and sewerage treatment system and all associated site works
Tullyglass Enniskeane Co.Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.