Proposed Development
The provision of a new road (0.380 km in length). The new road will alter the access road layout previously approved for a wind farm development (granted planning permission under Planning Reg. No. 10/8067) and will be used by construction and maintenance traffic associated with the previously permitted wind farm
Application Timeline
Application received
23 Dec 2013
Decision due
28 Apr 2014
Application Details
- Location
- Carrigagulla Ballinagree
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 December 2013Other applications received that week
- Status
- WITHDRAWN
- Decision
- Pending
- Decision Due
- 28 April 2014
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Re-routing of approx. 1.5 km of 110kV overhead line
Carrigagulla Crinnaloo South
The erection of a temporary 100m lattice type meteorological mast for a period of 5 years. The structure will be fixed to ground anchors by guy wires and will include instruments for measuring local climate conditions and all ancillary works.
Carrigagulla Near Ballinagree Co. Cork
Alteration to the locations of 4no. wind turbines and an increase in their hub height from 65m to 80m, construction of on-site tracks & associated works
Boggeragh Wind Farm Carrigduff Millstreet
Development of an access track for the construction and operation of the already permitted extension to the existing substation (planning Ref.No. 12/5834) and associated site works
Crinnaloo South Millstreet Co.Cork
Relocation of wind farm substation and substation compound
Crinnaloo South
Relocation of wind farm substation and compound
Crinnaloo South
Retention & completion of relocated substation compound, control buildings & alterations to the substation compound boundaries for which planning permission was granted under planning ref.no's 05/2490 & 01/1248 in the Boggeragh Mountains Wind Farm. Changes consist of an increase to the overall area of the compound from the permitted 65m X 61m to 65.2m X 77.5m, the addition of extra switchyard gear & associated cabling & ducting, 2no. control houses, new road layout within compound, waste treatment unit & soak pit, and associated site works
Crinnaloo South Millstreet
Extend and alter existing 110 kv sub station compound to include extension to existing site boundary with new palisade fencing, new 38kv control building with ancillary plant and equipment and associated site works
Crinnaloo South Millstreet
Alterations to the permitted 110kV Boggeragh Mountains Wind Farm substation compound (planning ref.no. 01/1248 & 05/2490). Changes will consist of an increase in the overall area of the compound, the addition of extra switchyard gear & associated cabling & ducting, 2no. control houses, new road layout within compound, septic tank & soakpit & associated site works
Crinnaloo South Millstreet
An extension to the existing 110K electricity subststion. The proposed work will involve the construction of new palisade fencing, bunded concrete plinth, power filter cabinet, transformer and access track including all associated site works
Crinnaloo South Millstreet Co. Cork
The submission window has closed
Observations on this application closed on Tuesday 4 February 2014, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?