← Back to search

The Pier Cullenagh Courtmacsherry Bandon, Co. Cork

CONDITIONAL

Planning application 14/338

Cork - Cork County Council

Proposed Development

The development consists of the demolition of a shed and reconstruction of same. Replacement of external cladding and roofing, the replacement of two number doors, the insertion of three number new window opes. An increase in ridge height and concrete buttresses. Retention of concrete capping with nibs along a stone wall and supporting a structure. The use of the shed is for storing boating and fishing equipment.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Jun 2014

  2. Decision: CONDITIONAL

    19 Feb 2015

  3. Decision due

    25 Feb 2015

  4. Grant issued

    30 Mar 2015

Application Details

Location
The Pier Cullenagh Courtmacsherry Bandon, Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
4 June 2014
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 February 2015
Grant Date
30 March 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
04/6609WITHDRAWN31 Aug 2004

Construction of clubhouse and associated siteworks and extension of pier walkway

Cullenagh Courtmacsherry

12m
03/5303WITHDRAWN24 Oct 2003

Construction of clubhouse & associated site works including extension of pier walkway

CULLENAGH, CULLENAGH,

39m
18/158CONDITIONAL28 Mar 2018

Change of use from shop to fast food restaurant with takeaway facilities

Main Street Cullenagh Courtmacsherry Co. Cork

44m
19/221INCOMPLETED APPLICATION3 Apr 2019

Alterations to dwelling house including: (a) cutting back existing roof, forming an open terrace area and re-building a section at the rear of the house,; and (b) replacement of existing front porch with zinc roof and glazing; and replacement of windows and doors to front elevation

Harbour House Courtmacsherry Co. Cork P72Y180

44m
19/313CONDITIONAL13 May 2019

Alterations to dwelling house including: (a) cutting back existing roof, forming an open terrace area and re-building a section at the rear of the house; and (b) replacement of existing front porch with zinc roof and glazing; and replacement of windows and doors to front elevation

Harbour House Courtmacsherry Co. Cork P72Y180

84m
99/1510REFUSED25 Mar 1999

Dwelling

CULLENAGH, CULLENAGH,

84m
98/2024REFUSED15 May 1998

2 No. dwellinghouses

CULLENAGH, CULLENAGH,

86m
08/248INCOMPLETED APPLICATION11 Feb 2008

Dwelling house and related site works

Wet Lane Cullenagh Courtmacsherry

86m
08/1010WITHDRAWN30 May 2008

Dwelling house and related site works

Wet Lane Cullenagh Courtmacsherry

90m
19/6948CONDITIONAL11 Dec 2019

The construction of a new detached dwelling house and all associated site works.

The Orchard Wet Lane Cullenagh Courtmacsherry, Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?