Kilnaglory Ballincollig

WITHDRAWN

Planning application 14/4047

Cork - Cork County Council

Proposed Development

The importation of soil and stone and concrete for the raising of agricultural field in order to improve the agricultural output of the field

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Jan 2014

  2. Decision due

    10 Mar 2014

Application Details

Location
Kilnaglory Ballincollig
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
14 January 2014
Status
WITHDRAWN
Decision
Pending
Decision Due
10 March 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

234m
08/8046CONDITIONAL23 Jul 2008

Raising level of agricultural land with surplus construction materials i.e inert soil/rock and topsoil

Kilnaglory Ballincollig

560m
19/6242CONDITIONAL12 Sept 2019

Construction of an entrance for agricultural use only, to provide access to the adjacent farm land.

Grange Ovens Co. Cork

560m
19/5994INCOMPLETED APPLICATION9 Aug 2019

Construction of an entrance for agricultural use only, to provide access to the adjacent farm land.

Grange Ovens Co. Cork

595m
17/4864Conditional Permission12 Apr 2017

The importation of soil & stone, bricks, tiles, ceramics and concrete for the raising of an agricultural field in order to improve the agricultural output of the field.

Kilnaglory Ballincollig Cork

607m
18/5760CONDITIONAL5 Jul 2018

A solar farm consisting of circa 75,000 m2 of solar panels on ground mounted frames, 1 no. single storey substation, 6 no. single storey electrical inverter/transformer stations, battery storage module and associated equipment container, security fencing, satellite pole, CCTV, and all associated ancillary development works. Construction access will be via the existing entrance from the L-2216 to the north with operational access from the local country road to the east.

Kilnaglory Co. Cork

617m
22/4155CONDITIONAL28 Jan 2022

Proposed works will include; 1) demolition of existing 2-storey dwelling house (known as Grange House), 2) construction of new replacement 2-storey dwelling house to be served by existing site entrance, 3) install new secondary packaged wastewater treatment system with percolation area to serve new dwelling house, 4) construction of new hardstand car parking area to side of new dwelling house and 5) all associated site works and new boundary treatments.

Grange Farm Grange Ovens Co.Cork

680m
13/5921CONDITIONAL7 Oct 2013

(a) Construction of an agricultural storage shed consisting of a dry potato storage area and a refrigerated potato storage area, staff facilities and a farm shop, installation of a waste water treatment system and soil polishing filter, and installation of a soakaway, and (b) alterations to existing entrance and ancillary site works on land

Grange Farm Grange Ovens

680m
19/5136REFUSED7 May 2019

(a) Construction of an agricultural storage shed consisting of a dry potato storage area and a refrigerated potato storage area, staff facilities and a farm shop, installation of a waste water treatment system and soil polishing filter, and installation of a soakaway, and (b) alterations to existing entrance and ancillary site works on land. Extension of Duration of Permission granted under Planning Reference: 13/05921.

Grange Farm Grange Ovens Co. Cork

689m
14/5356CONDITIONAL26 Jun 2014

Dwellinghouse (change of plans to dwelling granted under Planning Ref. No. 08/6541 and extended under Planning Ref. No. 13/5335)

Grange Ovens Co.Cork

689m
08/6541CONDITIONAL6 May 2008

Construction of dwelling with attached granny flat, garage, septic tank, percolation area and associated site works

Grange Ovens

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.