← Back to search

Lagan Bitumen Limited Rossmore Carrigtwohill Co.Cork

UNCONDITIONAL

Planning application 14/4061

Cork - Cork County Council

Proposed Development

Extension of quarrying of sand, gravel and limestone over an area of 7.2 hectares, an increase in the output of limestone from the existing quarry and the proposed extension area, the quarrying of limestone by blasting, the construction and operation of an asphalt plant and all ancillary site development works and landscaping of an overall site of 15.5 hectares. Extension of duration to Permission granted under An Bórd Pleanála Reference No. PL 04.203762 (pl.reg.no. 02/5476).

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Jan 2014

  2. Decision: UNCONDITIONAL

    6 Mar 2014

  3. Decision due

    12 Mar 2014

Application Details

Location
Lagan Bitumen Limited Rossmore Carrigtwohill Co.Cork
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Cork County Council

Timeline

Registration Date
16 January 2014Other applications received that week
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
6 March 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

251m
18/6874CONDITIONAL31 Oct 2018

The development consists of the continued use of the existing asphalt plant, the existing storage shed (837 sq. metres), and associated infrastructure and structures permitted under P. Ref. S/02/5476 (ABP Ref. PL04.203762); P. Ref. 14/04061; and P. Ref. 14/06489 (ABP Ref. PL04.244651) within an application area of 1.605 Hectares.

Rossmore Carrigtwohill Co. Cork

251m
21/5511INCOMPLETED APPLICATION31 May 2021

An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.

Rossmore Carrigtwohill Co. Cork

251m
20/4589CONDITIONAL20 Mar 2020

The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.

Rossmore Carrigtwohill Co. Cork

251m
19/5050CONDITIONAL26 Apr 2019

Development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref. 18/6874), from 40 no. days per annum to 60 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.

Rossmore Carrigtwohill Co. Cork

255m
14/6489CONDITIONAL20 Nov 2014

The application site comprises an existing asphalt plant (permitted as part of overall quarry development under Cork County Council Planning Ref. No. 02/5476, and An Bórd Pleanála Ref. No. PL04.203762) The proposed development seeks to provide for the extension of opening hours of asphalt plant to allow operations on site between 0600 hours and 1900 hours Mondays to Fridays and between 0700 hours and 1600 hours on Saturdays; occasional operations outside of normal working hours up to a maximum of 40no. days per annum. The proposed development will not result in any increase in the permitted output rate of existing quarry, which will be maintained at a rate of 250000 tonnes per annum

Rossmore Carrigtwohill Co.Cork

438m
03/4041CONDITIONAL13 Aug 2003

Dwelling

ROSSMORE, ROSSMORE,

441m
04/9144CONDITIONAL13 Dec 2004

Construction of vehicular entrance to service and maintain septic tank serving existing dwelling

The Bungalow Rossmore Carrigtwohill

657m
20/4199CONDITIONAL6 Feb 2020

The construction of 2 no. new ESB substation & distribution room buildings and the decommissioning of an existing ESB substation and all associated site works.

Rossmore Quarry Rossmore Townland Carrigtohill County Cork

689m
05/3032CONDITIONAL6 May 2005

Domestic workshop with attic space to rear of existing dwellinghouse

Rossmore Carrigtwohill

690m
09/7675INCOMPLETED APPLICATION18 Nov 2009

Retention of alterations to extension to dwelling

Rossmore Carrigtwohill