← Back to search

Parkmountain Youghal

CONDITIONAL

Planning application 14/4347

Cork - Cork County Council

Proposed Development

The erection of floodlighting around the perimeter of the main playing pitch

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Feb 2014

  2. Decision: CONDITIONAL

    14 Apr 2014

  3. Decision due

    22 Apr 2014

  4. Grant issued

    20 May 2014

Application Details

Location
Parkmountain Youghal
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
24 February 2014
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 April 2014
Grant Date
20 May 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
12/4742INCOMPLETED APPLICATION13 Apr 2012

Construction of a new changing room facility to replace existing facilities (existing permanent building will be retained for ancillary accommodation), installation of a foul water pumping station and all associated site works

Parkmountain Youghal

34m
12/4856CONDITIONAL25 Apr 2012

Construction of a new changing room facility to replace the existing facilities (the existing permanent building will be retained for ancillary accommodation),installation of a foulwater pumping station and all associated site works

Parkmountain Youghal Co. Cork

77m
22/4735CONDITIONAL5 Apr 2022

Erection of 2.4m high metal palisade fences with gates between the existing clubhouse and the south-western and north-eastern site boundaries, 1.2m high green pvc coated wire mesh fence behind the front (south-eastern) boundary wall (with a 1.2m high pedestrian gate at the east end of the front boundary) and on the south-western return boundary in front of the club house, a 2.4m high metal palisade fence to the side (south-western, behind the clubhouse) and rear (north-western) boundaries of the club property, together with all associated site works

Youghal Rugby Club Parkmountain Youghal Co.Cork

77m
21/4356CONDITIONAL16 Feb 2021

To erect on a temporary basis (for a maximum period of five years) six classrooms, in two prefabricated single-storey buildings detached from the main school building, together with all associated site works.

Parkmountain Youghal Co. Cork

117m
09/5886CONDITIONAL9 Jun 2009

Construction of new sports changing rooms and equipment store and associated site works

Parkmountain Youghal

147m
22/4363CONDITIONAL22 Feb 2022

The development of 2 no. extensions to the existing school, comprising of a 2-storey, 6 classroom block with ancillary teaching rooms of 1810m2 in area, to the north end of the existing school; and a new single storey Special Needs Unit of 600m2 in area, comprising teaching and ancillary rooms to the south end of the existing school, with additional car parking spaces provided on the site, and associated ancillary hard and soft landscaping works.

Parkmountain Youghal Co. Cork

158m
17/6812CONDITIONAL31 Oct 2017

Construction of a single storey dwelling, site entrance, connection to existing public services and all associated site works

Parkmountain Youghal Co.Cork

164m
03/184WITHDRAWN22 Jan 2003

Construction of industrial services drying facility, drying industrial products and waste material

PARKMOUNTAIN, PARKMOUNTAIN,

164m
09/4519CONDITIONAL20 Feb 2009

Construction of 2 no. detached dwellings, access roadway, connection to services and all associated site works to grounds of existing cottage

Parkmountain Youghal

169m
08/4436CONDITIONAL30 Jan 2008

Demolition of single storey extension to dwellinghouse and construction of two storey extension

Parkmountain Youghal

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?