← Back to search

Tullagreen Carrigtwohill

CONDITIONAL

Planning application 14/4457

Cork - Cork County Council

Proposed Development

Construction of a utilities building with associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Mar 2014

  2. Decision: CONDITIONAL

    28 Apr 2014

  3. Decision due

    30 Apr 2014

  4. Grant issued

    9 Jun 2014

Application Details

Location
Tullagreen Carrigtwohill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 March 2014
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 April 2014
Grant Date
9 June 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
13/5232CONDITIONAL27 Jun 2013

Construction of a boiler house including boiler stack and associated site works

Tullagreen Carrigtohill Co.Cork

0m
13/5147INCOMPLETED APPLICATION18 Jun 2013

Construction of a boiler house including boiler stack and associated site works at Tullagreen Townland, Carrigtohill. The proposed development is covered by an existing integrated pollution prevention and control licence no. P0571-03. The development refers to a modification to an establishment to which the major accident directive applies.

Tullagreen Carrigtohill Co Cork

0m
23/4096CONDITIONAL26 Jan 2023

Permission for retention of an emergency response team modular building, a medical team modular building, an engineering support office modular building, a chemical storage unit, an argon gas store, joining and enclosing of two chemical drum store canopies, a contractor’s smoking shelter, a general smoking shelter, a motorbike and bicycle shelter, a chemical dosing station enclosure, a water analysing cabin, increase height of the stairwell enclosure to the northwest of the K2 production building and enclosure to the stairs on the north east of the K2 production building which are alterations to that granted under planning permission number 18/6189, permanent security building and facilities support building temporarily granted under planning permission 13/4033, production building elevational alterations to that granted under planning permission number 14/4013, machinery parts storage building elevational and layout alterations and additional mezzanine storage area, as constructed, to that granted under planning permission number 15/6112, boiler house elevational and layout alterations and additional mezzanine maintenance area, as constructed, to that granted under planning permission number 13/5232, retention and completion of three IC4 engineering support office modular buildings and link corridor joining the engineering support office to the IC4 engineering support office #1, and all associated site works at the existing facility at Tullagreen and Carrigtohill (townland), Carrigtowhill, Co.Cork, T45 KD29. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.

Tullagreen & Carrigtohill Td. Carrigtwohill Co.Cork

1m
23/5589INCOMPLETED APPLICATION3 Aug 2023

Permission for increase in floor area at first floor level by 68.5m2 for office use, located in the existing double height entrance lobby, to our existing office & manufacturing building

Tullagreen Carrigtohill Co.Cork

2m
13/4033CONDITIONAL11 Jan 2013

Retention of an extension to the casting hall, utility boiler area and toilet block, administration waste area and balcony, waste water treatment de-sludging building, east side stairwell, south side stairwell, mixing room extension, drum store building location, roll store no. 1extension, roll store no. 2 extension, security building, facility cabin, lab offices, smoking shelter and associated works

Tullagreen Carrigtohill

2m
12/6601Application Invalid28 Dec 2012

Retention of an extension to the casting hall, utility boiler area and toilet block, administration waste area and balcony, wastewater treatment de-sludging building, east side stairwell, south side stairwell, mixing room extension, drum store building location, Roll store No. 1 extension, Roll store No.2 extension, security building, facility cabin, lab offices, smoking shelter and associated works

Tullagreen Carrigtohill Co.Cork

2m
12/6574CONDITIONAL18 Dec 2012

(1) Construction of a new two-storey extension with an area of 1695sqm for use as a membrane pilot research and development facility containing process rooms, research & development laboratories and plant areas. (2) Construction of a single storey extension of 100sqm to existing drum store, (3) Relocation of existing nitrogen tank, fire water tank and fire water pump house with an area of 31sqm (4) Relocation of existing cooling tower with concrete platform (5) Provision of 30 additional car parking spaces, and (6) Partial demolition of existing stone wall including all associated site works,

Tullagreen Carrigtwohill Co.Cork

2m
13/5948CONDITIONAL10 Oct 2013

Construction of a new two-storey extension with a proposed total floor area of 1995sqm for use as a membrane pilot research & development facility containing process rooms, laboratories, associated ancillary support areas and the provision of a roof mounted plant. (2) Retention of a new single storey fire water sprinkler pump house with a total floor area of 25sqm, (3) all associated site works

Tullagreen Carrigtwohill Co.Cork

3m
22/4839CONDITIONAL14 Apr 2022

The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building. At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin. The exis

Tullagreen and Carrigtohill (townland) Carrigtwohill Co.Cork

4m
12/4109INCOMPLETED APPLICATION27 Jan 2012

Construction of an expansion to the existing waste water treatment plant to include a Laboratory/Control building, an extension to the existing sludge dewatering building, an aeration tank, waste storage tanks, roads, piperacks, bunds, plinths, fencing, earthworks and associated works

Tullagreen Carrigtohill Co. Cork