← Back to search

Groine Croughta Ballyclough Mallow

CONDITIONAL

Planning application 14/5307

Cork - Cork County Council

Proposed Development

Demolition of existing uninhabitable dwelling and sheds, construction of a two-storey dwelling house with attached double garage and wastewater treatment plant and percolation area, and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jun 2014

  2. Decision: CONDITIONAL

    23 Sept 2014

  3. Decision due

    6 Oct 2014

  4. Grant issued

    29 Oct 2014

Application Details

Location
Groine Croughta Ballyclough Mallow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
19 June 2014
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 September 2014
Grant Date
29 October 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

167m
24/4965CONDITIONAL28 May 2024

Permission to demolish straw storage shed and construct a straw bedded cattle shed with slatted tank and ancillary works.

Groine Croughta Ballyclough Mallow, Co. Cork

327m
12/5342INCOMPLETED APPLICATION20 Jun 2012

Construction of a two storey dwelling complete with treatment plant, percolation area, entrance piers and ancillary works

Croughta Ballyclough Mallow Co. Cork

327m
15/5342CONDITIONAL23 Jun 2015

Construction of a two-storey dwelling (change of design from that granted under Planning Ref. No. 12/5809) and construction of a detached domestic garage

Croughta Ballyclough Mallow Co.Cork

327m
12/5809CONDITIONAL22 Aug 2012

Construction of a two-storey dwelling complete with treatment plant, percolation area, entrance piers and ancillary works

Croughta Ballyclough Mallow

332m
12/5590INCOMPLETED APPLICATION20 Jul 2012

Construction of a two storey dwelling complete with treatment plant, percolation area, entrance piers and ancillary works

Croughta Ballyclough Mallow Co. Cork

427m
22/6517CONDITIONAL11 Nov 2022

Permission to construct a dwelling house.

Lisleagh Ballyclough Mallow Co.Cork

436m
25/6496Grant with Conditions17 Nov 2025

Permission for construction of a poultry house for the purpose of rearing boiler, construction of two no. feeding bins, concrete apron, soiled water holding tank, underground attenuation water tank, gas tank, site entrance upgrading and all associated site works.

Croughta, Ballyclough, Co.Cork

519m
24/5503Conditional Permission9 Aug 2024

The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Crought, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38 kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The proposed grid connection will be installed underground mainly within the public road from the wind farm site at Croughta, Ballyclogh to the boundary of the 110 Kilovolts substation at Saint Joseph’s Road, Mallow passing through the townlands of Kilmaclenine, Croughta, Knockaunavaddreen, Copestown, (Kilmaclenine E.D.), Ballybeg (Buttevant E.D.), Baltydaniel East, Twopothouse, and Caurraghakerry (Caherduggan E.D); and Cloghlucas North, Curraghphadeen, Ballyviniter Upper, Ballyviniter Middle, Ballyviniter Lower, Parkadallane, Carrigoon More and Carrigoon Beg Mallow Rural E.D.).

Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork

519m
24/5215INCOMPLETED APPLICATION28 Jun 2024

Permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Croughta, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The prop

Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork

617m
05/6654CONDITIONAL14 Sept 2005

Dwellinghouse

Croughta Mallow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?