← Back to search

Ard na nEan Harbour View Garranefeen Kilbrittain, Co.Cork

CONDITIONAL

Planning application 14/5502

Cork - Cork County Council

Proposed Development

Demolition of existing shed/store building to rear, porch to side elevation, sun room to front elevation, and construction of new extensions and alterations to existing dwelling. Replacement of existing septic tank with new proprietary wastewater treatment unit and percolation area, realignment of the existing roadside boundary to improve sight distances and associated site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Jul 2014

  2. Decision: CONDITIONAL

    27 Aug 2014

  3. Decision due

    8 Sept 2014

  4. Grant issued

    3 Oct 2014

Application Details

Location
Ard na nEan Harbour View Garranefeen Kilbrittain, Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
14 July 2014Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 August 2014
Grant Date
3 October 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

69m
09/7064CONDITIONAL15 Sept 2009

Dwelling house, treatment system & associated site works

Harbour View Garranefeen Kilbrittain

87m
04/9326CONDITIONAL17 Dec 2004

Alterations to elevations and internal alterations to bar/restaurant

The Pink Elephant Harbour View Garranefeen Kilbrittain

138m
10/6225REFUSED6 Sept 2010

Dwelling and associated site works (existing entrance to be used)

Garranefeen Kilbrittain

211m
08/9015CONDITIONAL24 Sept 2008

Construction of detached domestic garage and tool shed with hobby room on first floor

Tara Harbour View Garranefeen Kilbrittain

211m
08/8580CONDITIONAL26 Aug 2008

Retention of green coated aluminium timber composite windows and doors, 1no. rooflight and conservatory and new site entrance to existing dwellinghouse

Tara, Harbour View Garranefeen Kilbrittain

211m
08/7870INCOMPLETED APPLICATION15 Jul 2008

Retention of green coated aluminium timber composite windows and doors, 1 no. rooflight and conservatory and new site entrance

Tara, Harbour View Garranefeen Kilbrittain

277m
19/4607CONDITIONAL12 Mar 2019

Demolition of an existing dwellinghouse and garage and construction of a replacement dwellinghouse, detached shed/store, waste water treatment system, realignment of and alterations to the site entrance and driveway and all associated site works

Seaward Lisheenaleen Kilbrittain Co. Cork

277m
17/6672REFUSED13 Oct 2017

Demolition of existing dwellinghouse and garage and for the construction of a replacement split-level dwellinghouse, detached garage, store, waste water treatment system, relocation of site entrance and all associated site works

Lisheenaleen Harbour View Kilbrittain Co. Cork

277m
22/4127CONDITIONAL26 Jan 2022

Planning permission for the demolition of an existing dwelling house, garage and septic tank, and the construction of a dwelling house and shed/home office, wastewater treatment unit, percolation area, realignment and alteration to the site entrance and driveway and all associated site works (Change of plan from permitted planning ref 19/4607).

Seaward Lisheenaleen Kilbrittain Co Cork

279m
13/6180WITHDRAWN15 Nov 2013

Demolition of existing ruin, construction of a new 4 bedroom, single storey dwellinghouse, access from existing driveway to the north of the site, new wastewater treatment plant; and associated landscaping and site works

Garranefeen Harbour View Kilbrittain

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?