Ballythomas East, Ballythomas West Horsehill More, Dunderrow Kinsale, Co Cork
CONDITIONALPlanning application 14/5747
Cork - Cork County Council
Proposed Development
The development will consist of the following:
- (1)A new IE15C warehouse building of 276m2 gross floor area, overall height not exceeding 7.1m above existing ground level
- (2)All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an Establishment to which the Major Accidents Directive applies.
Application Timeline
Application received
15 Aug 2014
Decision: CONDITIONAL
29 Sept 2014
Decision due
9 Oct 2014
Grant issued
7 Nov 2014
Application Details
- Location
- Ballythomas East, Ballythomas West Horsehill More, Dunderrow Kinsale, Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 August 2014
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 September 2014
- Grant Date
- 7 November 2014
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(1) Demolition of existing temporary offices, (2) construction of an extension to IE2 production building on two floors of total area 800sq.m., and (3) all associated site works
Ballythomas East, Ballythomas West Horsehill More Dunderrow Kinsale
(1) New IE27 warehouse building of 302sqm gross floor area, overall height not exceeding 6.1m above existing ground level. (2) Extension to the existing IE02 building entrance which comprises of (a) Demolition of 7.7sqm of existing entrance, (b) Construction of 21.9sqm of new entrance overall height not exceeding 4.65 m, resulting in a net gain of 14.2sqm floor area. (3) all associated site development works
Ballythomas East Ballythomas West Horsehill More, Dunderrow Kinsale, Co.Cork
The development will consist of the following works at the existing IE08 production building: (1) Demolition of (a) an existing single-storey section (gross floor space 26.9m2) of the building, (b) of an existing storage room at first floor level (gross floor space 11.6sqm) and (c) of an existing single-storey drum heating shed (gross floor space 25.9sqm) adjacent to the south of the building (total area for demolition is 64.4sqm); (2) The construction of (a) a new single storey extension of gross floor space 78m2 and height not exceeding 4.9m and (b) a new three storey extension of gross floor space 250.2m2 and total height not exceeding 15.8m, to be constructed in 2 phases (total new floorspace is 328.2sqm); (3) The provision of a new internal lobby (gross floor space 34sqm) including alterations to the existing western elevation to provide a new entrance; (4) All associated internal modifications to facilitate the 2 no. new extensions and the new internal lobby; and (5) All associated site development works.
Ballythomas East, Ballythomas West, Horsehill More Dunderrow Kinsale Co.Cork
(1) A new IE27 warehouse building of 302msq gross floor area, overall height not exceeding 6.1m above existing ground level. (2) Extension to the existing IE02 building entrance which comprises of (a) demolition 7.7msq of existing entrance and (b) construction of 21.9msq of new entrance overall height not exceeding 4.65m, resulting in a net gain of 14.2msq floor area. (3)All associated site development works
Ballythomas East, Ballythomas West Horsehill More, Dunderrow Kinsale Co. Cork
For the following works at the existing IE09C administration building: (1) Construction of a new single storey extension of gross floor area 92.78m2: (2) All associated internal modifications to facilitate the new extension and (3) All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an establishment to which the Major Accidents Directive applies.
Ballythomas East, Ballythomas West Horsehill More North Dunderrow, Kinsale Co. Cork
The following works at the existing IE09C administration building: (1) Construction of a new single storey extension of gross floor area 92.78m2: (2) All associated internal modifications to facilitate the new extension and (3) All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an establishment to which the Major Accidents Directive applies.
Ballythomas East, Ballythomas West Horsehill More North and Ballyvrin Lower Dunderrow Kinsale, Co. Cork
Demolition of existing idled IE3 production building and ancillary plant & equipment
Ballythomas East, Ballythomas West Horsehill More Dunderrow, Kinsale Co.Cork
The development will consist of: (1) The construction of a two storey building (IE40) for staff services and facilities including canteen, kitchen, gym, studio, changing facilities, offices, meeting rooms and administration areas with roof top plant enclosures, (2) Extension to the existing staff car park to provide an additional 150 permanent car parking spaces, (3) The creation of a new vehicular car park entrance gate on the Ballyvrin Road (L3215) northern boundary road, (4) All associated site development works including modifications to the internal site roads and site services, construction of external hard standing and landscaped areas and a single storey ancillary kitchen store, site lighting and fencing, 3 no. flagpoles and associated signage and the formation of landscaped areas, including berms and visual screening with tree planting and contractor’s temporary car park. The site currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.
Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow Kinsale, Co. Cork
(1) The construction of a two storey site services building IE40 with roof top plant enclosures. (2) Extension to the existing staff car park to provide an additional 150 permanent car parking spaces, (3) The creation of a new vehicular car park entrance gate on the Ballyvrin Road (L3215) northern boundary. (4) All associated site development works including modifications to the internal site roads and site services, construction of external hard standing areas and a single ancillary kitchen store, site lighting and fencing and the formation of landscaping areas, including berms and visual screening with tree planting and contractor’s temporary car park. The new development is on a site to which the Chemicals Act (Control of Major Accident Hazards Involving dangerous Substances) regulations 2015 (S.I 209 of 2015) applies.
Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow, Kinsale Co. Cork
The expansion of the existing 6,000cu.m firewater retention pond to provide a total capacity of 11,000 cu.m. the work involves alterations to the existing pond as well as the construction of an extended pond area with associated ground work and site works which includes reshaping of existing berms, construction of new berms, alterations to access path on berms, site lighting and fencing, site drainage layout (local to pond area) and reinstatement of site landscaping. The site currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.
Ballythomas East, Ballythomas West Horsehill More North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?