IDA Industrial Estate Anngrove Carrigtohill
CONDITIONALPlanning application 15/4850
Cork - Cork County Council
Proposed Development
Internal alterations and change of use of existing ground floor warehouse area to production use, consisting of process rooms and process support areas, the construction of two new single storey extensions to the front and rear of existing warehouse area for the purposes of plant and technical use, and minor alterations to existing elevations including all associated site works at existing premises
Application Timeline
Application received
24 Apr 2015
Decision due
18 Jun 2015
Decision: CONDITIONAL
18 Jun 2015
Grant issued
24 Jul 2015
Application Details
- Location
- IDA Industrial Estate Anngrove Carrigtohill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 24 April 2015
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 June 2015
- Grant Date
- 24 July 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erection of temporary prefabricated single storey office building and associated site works
IDA Industrial Estate Anngrove Carrigtwohill
Construction of new three storey office and laboratory building with enclosed link corridor to existing facility
IDA Industrial Estate Anngrove Carrigtohill
Construction of 2 storey extension to existing manufacturing building comprising of production and plant space and alterations to existing gowning suite and associated works including drainage, hard standings, bund, extension to carparking and roadways and provision of footpaths
Anngrove Carrigtwohill
Construction of 3 storey office building with enclosed link corridor to existing facility
IDA INDUSTRIAL ESTATE, IDA INDUSTRIAL ESTATE, ANNGROVE,
Three-storey R&D laboratory and office building
IDA Ind. Estate Anngrove Carrigtwohill
Construction of 2 storey building extension to existing manufacturing building comprising of expansion to existing gowning areas
Anngrove Carrigtwohill
Planning Permission for the following: (i) Demolition of the roof over existing Warehouse Two within the existing Poduction Building, (ii) Construction of a first floor extension to the existing Production Building for industrial use above existing Warehouse Two, (iii) Construction of a ground floor extension including a mezzanine floor over to the existing Production Building for maintenance workshop & stores use to the north of existing Warehouse Two, (iv) Construction of a 2 storey external goods lift to the east of the existing Production Building and (v) All associated site works at their existing Production Facility at Fournier Laboratories Ireland Ltd. (AbbVie), IDA Industrial Estate, Anngrove Townland, Carrigtwohill, Co. Cork. The development is covered by an existing Industrial Emissions Directive Licence Number P1046-01. A Natura Impact Statement (NIS) will be submitted to the planning Authority with this application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the Planning Authority.
IDA Industrial Estate Anngrove Townland Carrigtwohill Co. Cork
Fournier Laboratories Ireland Ltd. (AbbVie), intend to apply for the following at their Production Facility at the IDA Industrial Estate, Anngrove Townland, Carrigtwohill, Co Cork: 1) Permission for Retention of the following, a) Change to external cladding to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, b) Two Storey Extension to Existing Modular Building Block No. 01 (Total Floor Area = 244m2) to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, c) Single Storey Extension to Existing Modular Building Block No. 02 (Total Floor Area = 54m2) to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, d) Two Storey Modular Office Block No. 03 (Total Floor Area = 554m2). 2) Permission for Construction of the following, a) Proposed Stores Building No. 01 (Total Floor Area = 225m2), b) Proposed Stores Building No. 02 (Total Floor Area = 225m2), c) Proposed Warehouse Extension to Existing Building (Total Floor Area = 70m2), d) Demolition & Proposed Upgrade to Main Entrance (Total Floor Area = 24.4m2), e) Proposed Upgrade of Cladding to External Elevations of Main Production Building, f) Proposed Demolition of Existing Warehouse Building (Total Floor Area = 207.5m2). The proposed development is covered by an Existing Industrial Emissions Directive Licence Number P1046-01. The Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, County Hall, Carrigrohane Road, Cork, during its public opening hours, i.e. 9.00a.m. to 4.00 p.m. Monday to Friday (excluding public holidays). A submission or observation in relation to the application may be made in writing to the Planning Authority on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application, and such submissions and observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.
IDA Industrial Estate, Anngrove Townland, Carrigtohill, Co. Cork, T45 K202
Installation of two number high level illuminated signs, one on the south and one on the west elevation of the production building. The erection of two modular buildings to expand the canteen and the laboratory respectively with the associated site works at IDA Industrial Estate. The development is covered by an existing Industrial Emissions Directive Licence Number P1046-01
IDA Industrial Estate Anngrove Carrigtohill Co. Cork
i) New main vehicular entrance to the south to the main estate road within the IDA Industrial Estate, to comprise alterations to the existing boundary fencing, new gates and access control entrance system. ii) The construction of a single storey, 87.1sq.m security building adjacent to the new proposed entrance with canopy. iii) An extension to the north side of the existing Car Park to provide additional Staff parking spaces along with Contractor parking and lay down area, with the creation of a specific visitor parking area within the existing car park and alterations to the existing car park to facilitate the new proposed main vehicular entrance. iv) Alterations to the existing security building located adjacent to the existing entrance. Alterations to comprise reconfiguration of internal spaces as detailed, with changes to the southern and eastern facades to include new glazing and the relocation of the entrance to the existing security building. v) The construction of a covered walkway to the southern facade of the main existing building to extend and cover the existing reception and continue along the full facade at a varying height. vi) Landscaping works to include the creation of a new water feature, alterations to the position of 2 no. access control entrance systems to the existing entrance, 1) to be removed and replaced with gates (to existing main car park), and 2) to be relocated further northwards (for goods access), with relocation of visitor car parking adjacent to the existing security building and hard and soft landscaping within the newly extended car park and between the new security building and the main reception. vii) The construction of a 32.4sq.m IT infrastructure structure to the north of the existing security building with roof top plant and associated guarding. With all ancillary site development works. The development is covered by an existing Industrial Emissions Directive Licence Number P1046-01.
IDA Industrial Estate Anngrove Carrigtwohill Co. Cork