Planning application 15/5116

Cork - Cork County Council

Proposed Development

(1) Two-storey rear extension which includes single storey lean-to area to existing dormer dwelling with new ridge aligning with the existing, (2) new windows to existing south gable, and (3) removal of existing septic tank and installation of new sewage treatment unit

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 May 2015

  2. Decision: CONDITIONAL

    21 Jul 2015

  3. Decision due

    22 Jul 2015

  4. Grant issued

    31 Aug 2015

Application Details

Location
Lunasa Rathard Aherla
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
28 May 2015
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 July 2015
Grant Date
31 August 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

48m
16/4169CONDITIONAL2 Feb 2016

1. Construction of a new 2 storey extension to the western side of the existing dwelling, 2. Construction of additional first floor living space in the existing dwelling, 3. New single storey extension to the North of the existing dwelling, 4. New bay window to the existing dwelling, 5. New waste water treatment unit & percolation area, 6. Material alterations to the existing dwelling & reconfiguration of existing window / door openings, 7. New roof lights to the existing eastern facing roof, 8. Removal of existing outbuilding to the west of the site, 9. New vehicle entrance off existing public roadway and reconfiguration of existing driveway, 10. All site development works including landscaping.

Rathard Td Aherla Co. Cork

83m
22/4936INCOMPLETED APPLICATION25 Apr 2022

The construction of a dwellinghouse – change of house design from that granted previously under planning reference 21/6187 – a detached domestic use garage, an on-site waste-water treatment system, a new splayed vehicular access to the site from the public road and all other associated site works.

Rathard Aherla Co. Cork

84m
21/6187CONDITIONAL6 Aug 2021

To construct a dwellinghouse, garage and all associated site works.

Rathard Aherla Co. Cork

85m
22/5255CONDITIONAL31 May 2022

Permission for the construction of a dwelling house (change of house design from that granted previously under Planning Reference 21/6187), a detached domestic use garage, an on-site waste-water treatment system, a new splayed vehicular access to the site from the public road and all other associated site works

Rathard Aherla Co.Cork

123m
09/4291REFUSED2 Feb 2009

One and half storey dwellinghouse, detached garage, site entrance and installation of septic tank and percolation area

Rathard Aherla

124m
08/5157REFUSED3 Mar 2008

One and half storey dwellinghouse, detached garage and installation of septic tank

Rathard Aherla

129m
19/6727WITHDRAWN15 Nov 2019

Site development works for 6 detached dwellinghouses with new vehicular entrance and associated site works

Rathard Aherla Co. Cork

132m
17/4873CONDITIONAL11 Apr 2017

Construction of a new dwellinghouse, domestic garage and new entrance together with all other ancillary site works.

Rathard Aherla Co.Cork

139m
25/5022Conditional Permission30 May 2025

Permission for the construction of new storey & half detached dwelling house, domestic garage, individual waste water treatment system and all ancillary site works. (residential development currently under construction) this planning is a change of plans of site no.9, from what was granted planning permission under ref. no. 22/4222

Site No. 9, Cuan na Coille (Woodhaven) Rathard Aherla Co.Cork

176m
22/4222Conditional Permission8 Feb 2022

The construction of a residential development of 9 no. 4 bedroom, detached dwelling houses with ancillary single storey detached garages, individual wastewater treatment units and all ancillary site development works. Access to the proposed development will be via a new entrance from the L-2217. Ancillary site development works include the provision of a new footpath along the L-2217 which will connect to the existing footpath network to the north.

Rathard Aherla Co.Cork