Proposed Development
A 65sqm extension to existing plant room located on the third floor of the existing administration building
Application Timeline
Application received
17 Jun 2015
Decision: CONDITIONAL
28 Jul 2015
Decision due
11 Aug 2015
Grant issued
2 Sept 2015
Application Details
- Location
- Barnahely Ringaskiddy Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 17 June 2015
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 July 2015
- Grant Date
- 2 September 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development at Barnahely, Ringaskiddy, Co. Cork. The development will consist of; 1 no. 2-storey extension, with a floor area of approximately 48.0 square meters and height to parapet of 8.2 meters, to the existing warehouse locker room previously permitted under Cork Council Reg. Ref. 06/7499. The development will include associated ancillary site works, connection to existing underground services and landscaping. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02).
Barnahely Ringaskiddy Co. Cork
Permission for the construction of extensions to the canteen facilities at our existing bio-pharmaceuticals manufacturing facility. The proposed development will comprise: i) a c.93sqm single storey extension to the northern side of the existing canteen to facilitate additional seating, and ii) a c.90 sqm extension to the southern side of the canteen to facilitate additional kitchen space. This application relates to development which comprises an activity which holds an industrial emissions directive licence (reg. no. P0779-02)
Barnahely Ringaskiddy Co.Cork
Single storey pre-fabricated temporary building unit for a period of 5 no. years, consisting of 296sqm of office accommodation ancillary to the existing office and production facility and provision of new temporary covered walkway, including all associated site works
Barnahely Ringaskiddy
The erection of a single storey prefabricated temporary building unit for a period of 5 years, consisting of 360sqm of office accommodation ancillary to the existing office and production facility and the provision of a new temporary covered walkway, including all associated site works. This application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence
Barnahely Ringaskiddy Co Cork
Modular buildings and structures comprising as follows: 1) Permanent retention of an existing 884sq.m temporary equipment store building and extension of the building by a further c.414 sqm, 2) Construction of a new single storey c.110 sq.m amenity building and a new single storey c.60 sq.m workshop building, both located at the site waste water treatment plant area, 3) Temporary continuation for a further 5 years of use of the existing 4 no. single storey, 360 sq.m pre-fabricated temporary modular office units permitted under planning references 16/07150 and 22/4608, 4) Temporary continuation for a further 5 years of use of existing 276 sq.m modular gowning and locker building permitted under planning reference 21/5786. This application relates to development which comprises activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02).
Barnahely Ringaskiddy Co Cork
(i) 1 no. 3-storey office extension to the existing administration building with a floor area of approximately 2,721 square meters, an overall parapet height of 16.3 meters and connected by overhead passageway to the southern elevation of the administration building; (ii) temporary continuation for a further 2 years of use of the existing 4 no. single-storey, 360 square meter pre-fabricated temporary modular office units permitted under planning reference 16/07150; (iii) permanent continuation of use for the existing 95 no. car spaces temporarily permitted under reference 16/07150. The development will include associated works for local site roads, footpaths, connection to underground services, landscaping and site works. The proposed development is located on lands approximately 1.32 hectares within the existing permitted manufacturing campus. This application relates to development which comprises an activity which holds an industrial emissions directive licence (Reg. No. P0778-02)
Barnahely Ringaskiddy Co.Cork
A single storey building extension, (total floor area of 460m2) consisting of a freezer store room, electrical room and gowning area including a roof access stairs, and all associated site works. The application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence.
Barnahely Ringaskiddy
Permission for 1) construction of a 2 no. storey extension to the west elevation of production building P01 comprising gross floor area of approximately 294sq.m with maximum height of 19.2m (to parapet) to facilitate installation of new equipment (parts washers and autoclaves) to replace end-of-life equipment. 2) all associated site development works including adjustment to adjacent hard-standing and kerbing, repositioning of the existing Liquid Nitrogen Enclosure, provision of drainage and site service connections and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02)
Barnahely Ringaskiddy Co.Cork
Permission for (i) Construction of a 2 no. storey extension to the west elevation of production building P01 comprising gross floor area of approximately 294sq.m with maximum height of 19.2m (to parapet) to facilitate installation of new equipment (parts washers and autoclaves) to replace end-of-life equipment. (ii) All associated site development works including adjustment to adjacent hard-standing and kerbing, repositioning of the existing Liquid Nitrogen Enclosure, provision of drainage and site service connections and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02)
Barnahely Ringaskiddy Co.Cork
The proposed development will consist of: 1. Temporary permission for 5-years for the continuation of use of 2 No. existing single storey modular construction Office Buildings (Buildings No’s. 8 and 9) comprising a floor area of c. 48.5 sqm each (c. 97.0 sqm total floor area), and each with max. height of c. 2.7 meters, at south-eastern part of the campus. 2.Temporary permission for 5-years for the continuation of use of 2. No. existing single storey modular construction office/workshop Buildings (Buildings No’s. 13 and 14) comprising a floor area of c. 45.0 sqm each (c. 90.0 sqm total floor area) and each with max. height of c. 2.7 meters, at northern part of the campus. 3. Permanent Permission for the modular production support building (former Gowning Room) granted temporary permission under Reg. Refs. 21/5786 & 24/5501 for continued production support activity with building max. height of c. 3.76m, to include an increase of floor space by c. 7.0 sqm to provide a gross floor area total of c. 283 sqm, ancillary plant for air conditioning and air handling units, and a minor adjustment of the building’s position relating the connection corridor to Production Building P02. This application relates to development, which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-03).
Johnson & Johnson Innovative Medicine, Barnahely, Ringaskiddy, Co. Cork, P43 FA46