← Back to search

Midleton 110 kV Carrigogna Midleton Co. Cork

CONDITIONAL

Planning application 15/5441

Cork - Cork County Council

Proposed Development

Alterations to the existing Midleton 110kV station to include; extension to the existing compound palisade fence, single storey side extension to the existing control building, 1 no. 18meter high monopole, 1 no. transformer and transformer bay, associated drainage and site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Jul 2015

  2. Decision: CONDITIONAL

    17 Aug 2015

  3. Decision due

    25 Aug 2015

  4. Grant issued

    22 Sept 2015

Application Details

Location
Midleton 110 kV Carrigogna Midleton Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
1 July 2015
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 August 2015
Grant Date
22 September 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

23m
22/5789CONDITIONAL29 Jul 2022

Alterations to the existing Midleton 110kV station to include a single storey extension on the northern side of the existing control building and the extension of the existing compound palisade fence to the north of the site.

Carrigogna Midleton Co. Cork

52m
06/12675CONDITIONAL24 Nov 2006

Two storey extension to dwellinghouse and replacement of windows

Carrigogna Midleton

110m
18/4550CONDITIONAL7 Mar 2018

Development of grid system services facility within a total site area of up to 0.76 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switcher gear, electrical inverter/transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, animal fencing, earth bund and landscaping works and all associated ancillary infrastructure on land.

Carrigogna Midleton Co. Cork

118m
23/5246CONDITIONAL19 Jun 2023

10 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure.

Carrigogna Midleton Co Cork

145m
07/9533CONDITIONAL12 Jul 2007

Construction of sunroom extension to dwelling

Carrigogna Midleton

147m
22/6054CONDITIONAL12 Sept 2022

Construct a two-storey dwelling house, domestic garage, new vehicular entrance, wastewater treatment system and percolation area and all associated site works

Carrigogna Midleton Co.Cork

178m
08/6739CONDITIONAL16 May 2008

Relocation of existing vehicular entrance to serve existing warehouse/light industrial units

Carrigogna Midleton

210m
07/13412CONDITIONAL21 Dec 2007

Retention of 1 no. building comprising of 5 no. warehouse/light industrial units with first floor mezzanine to 3 no. units and provision of car park/hardstanding area

Carrigogna Midleton

214m
25/6374Grant with Conditions3 Nov 2025

A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground mounted frames, 1 single-storey delivery station, 1 single-storey transformer station, 1 single-storey spare parts storage container, construction of a new site entrance off the L - 36014 local road, internal access tracks, security fencing, CCTV, landscaping and all associated development site works. The solar panels are arranged within a total developable site area (including ancillary works) of 8.85ha at Carrigogna, Midleton, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (directive(EU) 2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Carrigogna, Midleton, Co. Cork

220m
20/4343CONDITIONAL21 Feb 2020

Construct a two storey dwellinghouse, domestic garage, new vehicular entrance, wastewater treatment system and percolation area and all associated site works

Carrigogna Midleton Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?