← Back to search

Applegreen Service Station The Spa Mallow Co. Cork

REFUSED

Planning application 15/5690

Cork - Cork County Council

Proposed Development

Installation of a main identification sign

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jul 2015

  2. Decision: REFUSED

    18 Sept 2015

  3. Decision due

    22 Sept 2015

Application Details

Location
Applegreen Service Station The Spa Mallow Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
29 July 2015
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
18 September 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
06/55024CONDITIONAL28 Mar 2006

change of use of existing ground floor residential area for use as a self contained retail unit, alterations to the existing facade namely the breaking out of an existing window to allow for a shopfront incorporating a signage canopy, pillasters and disabled access door

5 Spa Square Mallow Co. Cork.

35m
23/4349CONDITIONAL28 Feb 2023

Alteration to rear elevation and extensions to same, alterations and extensions to 2 existing apartments at 1st & 2nd floor, No.5 Spa Square. Provision of 4 new apartments, 1 at first floor at No.3 and 1 at first floor and second floors of No. 4 Spa Square, 1 at 3rd floor No. 4 & 5 Spa Square, relocation of extract ducts from commercial units at ground floor along with associated site works.

3, 4 & 5 Spa Square Mallow Co Cork

39m
23/5322Conditional28 Jun 2023

Permission for retention for a two-storey extension to rear of existing dwelling, partial stone finish to front façade and all associated site works

No.2 Spa Walk Mallow Co.Cork

39m
10/55011WITHDRAWN26 Feb 2010

permission for change of use of part of first floor of existing retail premises to a residential two bed apartment

Spa Walk Mallow Co. Cork.

39m
09/55026NEW APPLICATION23 Jul 2009

change of use of part of first floor of existing retail premises to a residential two bedroom apartment

Spa Walk Mallow Co. Cork.

47m
04/55005CONDITIONAL28 May 2004

Permission for change of use of ground floor area from residential to auctioneers and financial services use, incorporating alterations to the front elevation and signage

The Town House Bridewell Lane Mallow Co. Cork.

54m
25/6152Grant with Conditions10 Oct 2025

Permission for change of use of the existing ground floor unit 1, from the original permitted retail use to an apartment, including alterations to the front elevation.

Ground Floor Unit 1, The Belfry, Bridewell Lane, Mallow, Co. Cork, P51 DN2V

56m
08/55030WITHDRAWN21 May 2008

Permission to (1) demolish existing building adjoining Clock Tower incorporting the "Fiddle Bar" and the "Cavern Bar" (2) refurbishment and restoration works of the Clock Tower building whcih is a protected structure (3) construction of a four storey retail/office building (4) provision of loading bay to Bridewell Lane together with ground works and other associated works at Clock Tower (Spa Square), Fiddle Bar fronting onto Spa Square, backing onto Bridewell Lane and the Cavern Bar fronting onto Bridewell Lane,

Mallow Co. Cork.

56m
09/55029CONDITIONAL14 Aug 2009

(i) refurbishment and restoration works of the clock tower building which is a protected structure. (2) refurbishment and restoration works to the Fiddle Bar which is a proposed protected structure (3) demolish existing building adjoining Clock Tower incorporating the Cavern Bar (4) construction of a four storey retail/office building (5) provision of loading bay to Bridewell Lane together with ground works and other associated works at Clock Tower (Spa Square), Fiddle Bar fronting onto Spa Square, backing onto Bridewell Lane and the Cavern Bar fronting onto Bridewell Lane,

Mallow Co. Cork.

56m
07/55065WITHDRAWN16 Aug 2007

Permission to carry out the following: 1) Demolish exissting building adjoining clock tower incorporating the Fiddle Bar and the Cavern Bar. 2) Refurbishment and restoration works of the Clock Tower building which is a protected structure. 3) Construction of a four storey retail/commercial/office building together with ground works and associated works at Clock Tower (Spa Square), Fiddle Bar fronting onto Spa Square, backing onto Bridewell Lane and the Cavern Bar fronting onto Bridewell Lane, Mallow, Co. Cork.

Spa Square Mallow Co Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?