Proposed Development
- 1.Change of use and alterations of an existing single storey laboratory building to meeting rooms and ancillary areas.
- 2.Alterations and refurbishment of an existing single storey office building and extension to form a two storey office building.
- 3.Extension and alteration of an existing maintenance building and canteen.
- 4.Construction of a new two storey laboratory building.
- 5.Construction of new car parking and associated works.
- 6.Removal of existing boundary hedging and construction of a new boundary wall and fence.
- 7.Upgrade of an existing wastewater treatment plant and petrol interceptor.
- 8.Construction of site lighting and ancillary site works.
Application Timeline
Application received
6 Aug 2015
Decision: CONDITIONAL
15 Jul 2016
Decision due
18 Jul 2016
Grant issued
22 Aug 2016
Application Details
- Location
- Lombardstown Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 6 August 2015Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 July 2016
- Grant Date
- 22 August 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for 1) Demolition of existing raw materiel silos and concrete plinth, parts store building, intake building, a shed and all ancillary works, 2) Construction of a new extension to the existing mill building for the installation of raw material and finished product storage bins, new mixing, grinding line and press line mill equipment, surface water drainage and all ancillary works, 3) Construction of a new parts store building and a new raw material intake building and all associated landscaping and boundary treatment works. The Mill production facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement (NIS) will accompany this application.
Lombardstown Mallow Co.Cork
The development will consist of : demolition of existing raw material silos and concrete plinth, parts store building, intake building, a shed and all ancillary works. Construction of a new extension to the existing mill building for the installation of raw material and finished product storage bins, new mixing, grinding line and pressline mill equipment, surface water drainage and all ancillary works. Construction of a new parts store building and a new raw material intake building and all associated landscaping and boundary treatment works. The mill production facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement (NIS) will accompany this application
Lombardstown Mallow Co.Cork
Dwellinghouse and effluent treatment unit
Lombardstown Mallow
Alterations and extension to dwellinghouse
Lombardstown Mallow
Dwelling and garage
Lombardstown, Mallow
Extension and alterations to existing dwellinghouse
Lombardstown Mallow
Alterations and extension to dwelling
Lombardstown Mallow
Residential development - 40 no. dwellinghouses, 11 no. serviced sites for dwellings, proprietary treatment unit, 2 no. main entrances and associated works
Lombardstown Mallow
Development to consist of (a) 7 no. two storey detached dwellings, (b) 22 no. two storey semi detached dwellings, (c) 12 two storey townhouses, (d) 10 serviced sites for dwellings (e) associated site works for the above which will include (1) sewerage pumping station on a separate site (2) two main entrances from public road
Lombardstown Mallow
A) 7 no. two storey detached dwellings, B)22 no. two storey semi detached dwellings, C) 12 no. two storey townhouses D) 10 serviced sites for dwellings E) associated site works for the above which will include 1 no. sewerage pumping station on a separate site and 2 no. main entrances from the public road
Lombardstown Mallow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?