Ardnageehy Charleville Co. Cork

INCOMPLETED APPLICATION

Planning application 15/5975

Cork - Cork County Council

Proposed Development

Retention of 3 no. attached buildings used as a paunch manure storage facility and existing concrete apron and boundary walls. Permission for the construction of a side extension to the facility and extension of existing concrete apron and boundary walls together with contained water collection sump and disposal pipework to adjacent waste water treatment plant

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Sept 2015

  2. Decision due

    28 Oct 2015

Application Details

Location
Ardnageehy Charleville Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
3 September 2015
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
28 October 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
14/6476WITHDRAWN19 Nov 2014

Extension to existing paunch manure holding building and adjoining concrete apron and boundary walls

Ardnageehy Charleville Co.Cork

0m
14/6387INCOMPLETED APPLICATION10 Nov 2014

Extension to existing paunch manure holding building and adjoining concrete apron and boundary walls

Ardnageehy Charleville Co.Cork

85m
10/6157CONDITIONAL31 Aug 2010

2MW wind turbine with maximum tower height of 85 metres and a maximum rotor diameter of 82 metres together with associated underground cabling works

Ardnageehy Charleville

90m
16/4520CONDITIONAL8 Mar 2016

Retention for 3 no. attached buildings, concrete yard, boundary walls and associated works and for Retention of Change of Use from agriculture to a paunch manure and de-watered sludge storage faculty. Permission is sought to construct a side extension to this paunch and de-watered sludge facility and to extend the existing concrete yard and boundary walls together with contaminated water collection sump and disposal pipework to adjacent wastewater treatment plant and associated works all on their lands.

Ardnageehy Charleville Co. Cork

94m
24/4728INCOMPLETED APPLICATION25 Apr 2024

Permission for a) a wind turbine with a maximum hub height of 85m, a maximum rotor diameter of 71m and a maximum overall blade tip height of 120.5m, b) a transformer building, c) associated site works, including temporary construction access, for energy self-supply on-lands adjacent to its existing plant. The turbine dimensions have been reduced from that originally granted under planning reg 10/6157 (PL04.238982). The application relates to a facility which is licensed by the environmental protection agency under an industrial emissions (IE) licence. The application will be accompanied by a Natura Impact Assessment (NIS).

Ardnageehy Charleville Co.Cork

107m
23/5065INCOMPLETED APPLICATION26 May 2023

Permission for; a) a wind turbine with a maximum height of 85m, a maximum rotor diameter of 71 m and a maximum overall blade tip height of 120.5m; b) a transformer building; c) associated site works, including temporary construction access, for energy self-supply on lands adjacent to its plant Ardnageehy, Charleville, Co.Cork. The turbine dimensions have been reduced from that originally granted permission under planning reg 10/6157 (PL04.238982). The application relates to a facility which is licensed by the Environmental Protection Agency under industrial Emissions (IE) Licence. The application will be accompanied by a Natura Impact Statement (NIS).

Ardnageehy Charleville Co.Cork

138m
04/3727CONDITIONAL27 May 2004

Septic tank & percolation area

Ardnageehy Charleville

218m
07/6890CONDITIONAL10 Apr 2007

Retention of domestic garage

Ardnageehy Charleville

219m
04/4438CONDITIONAL18 Jun 2004

Retention of domestic garage/store

Ardnageehy Charleville

348m
04/7707CONDITIONAL13 Oct 2004

Extensions to dwelling

Ardnageehy Charleville

The submission window has closed

Observations on this application closed on Wednesday 7 October 2015, five weeks after it was received. The authority cannot accept a late submission.