← Back to search

Meelin Village (Various locations at) Knockduff Upper Td. Newmarket Co. Cork

INCOMPLETED APPLICATION

Planning application 15/6700

Cork - Cork County Council

Proposed Development

Installation of 1 no. general view closed-circuit television camera (CCTV) and 2 no. number plate cameras at 3 no. locations within Meelin Village

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Nov 2015

  2. Decision due

    2 Feb 2016

Application Details

Location
Meelin Village (Various locations at) Knockduff Upper Td. Newmarket Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
30 November 2015
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
2 February 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

57m
04/8269CONDITIONAL9 Nov 2004

Dwelling

Knockduff Upper Meelin

69m
15/6767CONDITIONAL7 Dec 2015

Permission for change of use of a former nursing home to residential care facility for up to 8 people. Permission also sought for use of the service block for accommodation, demolition of an existing extension to the rear, the construction of a new extension to the rear, alterations to the roof at the rear, removal of a window at first floor level on the rear elevation, a new door on the front and rear elevations, new wheelchair ramp at the south elevation, provision of 14 car spaces and 6 bicycle spaces, new fence and gate to enclose building, connection to pubic sewer and associated works. Retention for alterations to the windows along the front elevation, window at first floor level on the front elevation, provision of a boiler house to the rear, alterations to the windows along the south elevation, and the external stairs and door to storage area and service block and associated works

Meelin Knockduff Upper Newmarket Co. Cork

74m
09/7062CONDITIONAL15 Sept 2009

Alterations and extensions to nursing home to include front and rear extensions with altered rear lounge area, upgrading of sewage treatment unit, internal road layout, car parking, outdoor recreational areas, landscaping and retention and completion of separate service block; drainage filter services location and vehicle entrance off L-5062 road.

Resthaven Nursing Home Meelin Knockduff Upper Newmarket

74m
09/5927REFUSED11 Jun 2009

Alterations and extensions to nursing home to include front extension to provide dining room, entrance lobby and enlarged kitchen area, extension to rear to provide additional bedrooms, altered lounge area and ancillary works

Resthaven Nursing Home, Meelin Knockduff Upper Newmarket

85m
07/11582CONDITIONAL10 Oct 2007

Alterations and construction of two classroom extension to school to include staff facilities and new entrance foyer, installation of treatment plant and associated site works

Knockduff Upper Meelin Newmarket

89m
19/4962CONDITIONAL17 Apr 2019

(i) Construction of a new two storey pitched roof extension with glazed link to the rear of existing residential care facility to cater for an additional 8 residents (ii) Extension of existing carpark area to provide 8 additional carparking spaces (iii) Installation of new waste water treatment plant to serve the new extension (iv) Decommission of existing waste water treatment percolation area (v) Installation of new raised sand/soil percolation area to serve both the new and existing waste water treatment plants (vi) all associated site works necessary to facilitate the development.

Meelin Knockduff Upper Newmarket Co. Cork

89m
19/4520INCOMPLETED APPLICATION4 Mar 2019

(i) Construction of a new storey two storey pitched roof extension with glazed link to the rear of existing residential care facility to cater for an additional 8 residents (ii) Extension of existing carpark area to provide 8 additional carparking spaces (iii) Installation of new waste water treatment plant to serve the new extension (iv) Decommission of existing waste water treatment percolation area (v) Installation of new raised sand / soil percolation area to serve both the new and existing waste water treatment plants (vi) all associated site works necessary to facilitate the development

Meelin Knockduff Upper Newmarket Co. Cork

90m
21/6028INCOMPLETED APPLICATION22 Jul 2021

Retention permission is sought for minor amendments/alterations of the development permitted under Cork County Council planning reg ref: 19/04962. The amendments/alterations include the following: (i) increase of previously permitted floor area of building from 462m2 to 508m2 (ii) change of orientation of extension (iii) alterations to all previously approved elevations of extension (iv) construction of new plant room to east elevation of extension (v) installation of new boundary treatments (vi) increase in height of previously approved boundary treatments (vii) widening of existing driveway entrance (viii) alterations to previously approved site and landscaping plan, and (ix) all associated and ancillary works to facilitate the changes.

Cois Dalua residential Care Facility Meelin Knockduff Upper Newmarket, Co. Cork

90m
21/7006Conditional Permission9 Nov 2021

Permission for retention of as built two storey extension with link to the rear of the existing residential care facility providing 2 no. self-contained apartments and 6 no. ensuite bedrooms and ancillary facilities including plant room, new boundary treatments, widening of entrance/driveway, landscaping and associated works (change of plan and layout from that permitted under planning reg. no. 19/4962) on a site to the south of the Cois Dalua Care Facility

Meelin Knockduff Upper Newmarket

92m
23/5473CONDITIONAL18 Jul 2023

Permission for demolition of the existing single storey storage outbuildings to rear of the existing residential care facility. Construction of a new single storey pitched roof office and storage building to the rear of the existing care facility with new vehicle access. Extension of the existing carpark area to provide 6 no. additional carparking spaces. Relocation and extension of the existing external refuse area. Internal layout alterations for the addition of 3 no. bed spaces, ground works to allow for additional garden areas, and all associated internal & external works necessary to facilitate the development.

Cois Dalua, Meelin Knockduff Upper Newmarket Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?