Building H The Waterfront Inchydoney Road/ Clarke Street Junction, Clonakilty
INCOMPLETED APPLICATIONPlanning application 16/200
Cork - Cork County Council
Proposed Development
Retention of alterations to the elevations of building H (refer to previous granted planning permission ref. no. 5005/08), proposed alterations to existing elevations, and for permission to change the use of the first floor from permitted retail to residential use, consisting of 2 no. two bedroom apartments and a two bedroom duplex apartment. The proposed development is to include the provision of parking spaces and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
5 Apr 2016
Decision due
30 May 2016
Application Details
- Location
- Building H The Waterfront Inchydoney Road/ Clarke Street Junction, Clonakilty
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 5 April 2016
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 30 May 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of alterations to the elevations of building H (refer to previous granted planning permission ref. No. 50005/08), proposed alterations to existing elevations, and for permission to change the use of the first floor from permitted retail to residential use, consisting of 2 no. Two bedroom apartments and a two bedroom duplex apartment. The proposed development is to include the provision of parking spaces and all associated site works.
Building H, The Waterfront Inchydoney Road/Clarke Street Junction Clonakilty Co Cork
Retention of alterations to the facades of Building H (refer to previous granted planning permission ref. no. 50005/08), and for permission to change the use of the first floor from permitted retail to residential use, consisting of 2 no. two bedroom apartments and a two bedroom duplex apartment. The proposed development is to include the provision of parking spaces and all associated site works
Building H, The Waterfront, Inchydoney Road/Clarke Street Junction, Clonakilty Co. Cork
Change of use of a ground floor retail unit to an office, including minor alterations to existing elevations and associated siteworks
Building H, The Waterfront Inchydoney Road / Clarke Street Junction Clonakilty, Co. Cork
Change of use of a ground floor retail unit to an office, including minor alterations to existing elevations and associated siteworks
Building H, The Waterfront Inchydoney Road / Clarke Street Junction Clonakilty, Co. Cork
Permission for a craft-distillery and visitors centre. The proposed development will consist of Permission for; 1) A change of use of Building J from permitted Gaelscoil to craft distillery with display areas, 2) Change of use part of Building K from permitted ground floor retail, 1st, 2nd & 3rd floor Gaelscoil to use as a visitors centre. The proposed visitors centre will include a shop with off-licence at ground floor level, tasting room and display areas at 1st floor level, media room and open plan area at 2nd floor level and ancillary office use & staff facilities at 3rd floor level, 3) Change of use part of building K from permitted ground floor retail to use as a cafe/restaurant, 4) Modifications to the facade including new signage, display windows, a new pedestrian walkway linking Building J & K at first floor level, 5) Retention of a fire escape stairway to Building K and permission to enclose same with select metal cladding, 6) Retention of a ground floor extension to Building K (to form part of the proposed restaurant), 7) A distillery service yard to include 3 no. malt silos, a water tank, a pot ale tank, a process water holding tank, IBC storage, spent grain storage and an external store, 8) 2no. LPG gas compounds, 9) Restaurant service yard, 10) Site development works to include alterations to the existing plaza consisting of the relocation and replacement of the existing ramp and stairs, internal access roadways, landscaping, footpaths & an ancillary car park, 11) a modified entrance at Clark Street including upgrades & provision of a roundabout at the existing Inchydoney Road/ Casement Street/ Clarke Street junction on the N71.
The Waterfront Inchydoney Road/Casement Street/Clarke Street Junc Clonakilty Co Cork
Change of plan from existing planning permission ref. no. 50005/07. The changes to building J are as follows: 1) The addition of a third floor plant room (29.5sqm) 2) An increase of floor area for the ground floor bank from 158.9sqm to 214sqm 3) An increase of floor area for the first and second floor offices from 374sqm to 380sqm. 4) Minor amendments to the facades. Building J will be built as Phase 1 of 5 Phases of construction of the existing planning permission ref. no. 50005/07. In addition the construction of a temporary entrance during construction, a temporary new road layout on part of the site and temporary surface car parking
The GAA Grounds Clarke St/Inchydoney Rd Clonakilty Co Cork
for change of plan from existing planning permission ref. no. 50005/07. The changes to building K are as follows: 1.) Part construction of Building K involving the construction of the west side only. The relocation of the stair cores on the ground floor, change of use in part of the first floor to retail (190.6 sqm) and change of use in part of the second and third floors to commercial use (332.2 sqm), the reduction of 12 no. apartments to 6 no. apartments and amendments to the facades to facilitate the above mentioned changes. 2.) The omission of part of the basement directly underneath the west side of Building K (future car parking provisions to be made in a future phase of the development). Building K will be built as part of Phase 1 of 5 Phases of construction of the existing planning permission ref. no. 50005/07
GAA Grounds Clarke St/Inchydoney Road Clonakilty Co. Cork
For change of plan from existing planning permission ref. no. 50005/07. The changes to building H are as follows: 1) The addition of a third floor plant room to Building H and the omission of 5 no. apartments on the first and second floors and change of use of first floor to retail/commercial (221sqm) and change of use of second floor to offices/commercial (221sqm), therefore no change in floor area. There is an overall increase in height of the building to accommodate services. Building H will be built as part of Phase 1 of 5 phases of construction of the existing planning permission ref. no. 50005/07
The GAA Grounds Clarke St/Inchydoney Rd Clonakilty Co. Cork
Demolition of bathroom and garage and permission to construct extension and to make minor alterations to existing dwelling and all associated site works
No. 16 Casement Street Clonakilty Co Cork
Installation of 1 no. new internally illuminated gable sign on the west elevation of the existing Aldi store
The Waterfront Inchydoney Road / Casement Street Clarke Street Junction Clonakilty, Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?