No's 3 & 4 Forthland Summer Cove Ardbrack Kinsale, Co. Cork
CONDITIONALPlanning application 16/5096
Cork - Cork County Council
Proposed Development
Alterations and extension to first floor apartment and extension to ground floor apartment, (change of plan to that permitted under planning ref: 15/5950) to include construction of additional window to front and increase in size of velux unit to rear elevation of first floor apartment and all associated site works
Application Timeline
Application received
9 May 2016
Decision: CONDITIONAL
30 Jun 2016
Decision due
4 Jul 2016
Grant issued
5 Aug 2016
Application Details
- Location
- No's 3 & 4 Forthland Summer Cove Ardbrack Kinsale, Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 May 2016Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 June 2016
- Grant Date
- 5 August 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of detached two storey structure for use as dwelling unit
Ardbrack Kinsale
Subterranean bedroom extension to existing dwellinghouse, divided into 4 seperate structures connected by a subterranean route situated below the existing car park leveland to the lower western part of the site,a glazed link connecting to the existing house underneath the existing entrance bridge,leads to a new staircase inserted into the existing lower level boiler room and extensive new planting
O'Flahertys house Ardbarck Kinsale
Extension to dwellinghouse
Ardbrack Kinsale
Construction of detached two storey structure for use as dwelling unit
Ardbrack Kinsale
Subterranean bedroom extension to the existing dwellinghouse, divided into 4 separate structures, connected by a subterranean route situated below the existing car-park level and to the lower western part of the site, containing a family room, 4 bedrooms and 2 bathrooms. A glazed link connecting to the existing house, underneath the existing entrance bridge, leads to a new staircase inserted into the existing lower level boiler room. The proposal includes extensive new planting concealing the development from town and seaward sides, extension of duration of permission granted under An Bord Pleanala ref.no. PL 04.226784(planning reg. no. 07/10997)
Weekend (O'Flaherty) House Ardbrack Kinsale
Removal of existing temporary classrooms (3 no. portacabins) including steel shed and construction of a two-storey extension to existing school consisting of 3 no. classrooms, 3 no. resource rooms, toilets, plant room and lift, together with all associated site works and services
Summercove National School Ardbrack Kinsale
Erection of a temporary classroom and all associated site works and services
Summercove National School Ardbrack Co. Cork
Alterations and extensions to dwellinghouse
Treetops Ardbrack Kinsale
(1) Retention of conversion of domestic garage to studio apartment and retention of its associated tourism-related short-term letting use, (2) retention of the tourism-related short-term letting use of the existing permitted Granny Flat and Yurt, and (3) retention of wc/plant facility associated with the permitted Yurt together with associated site works.
Mentone Scilly Walk, Ardbrack Kinsale Co. Cork
Retention for a) as constructed domestic garage, b) secondary waste water treatment unit and polishing filter with all necessary ancillary site services.
Cois an Uisce Forthill, Summercove Kinsale Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?