← Back to search

Meelin Village Knockduff Upper Newmarket, Co. Cork

INCOMPLETED APPLICATION

Planning application 16/6250

Cork - Cork County Council

Proposed Development

Installation of closed circuit television cameras (CCTV) on 5m high poles at 3 no. locations in Meelin village.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Sept 2016

  2. Decision due

    3 Nov 2016

Application Details

Location
Meelin Village Knockduff Upper Newmarket, Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
9 September 2016
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
3 November 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
16/7218CONDITIONAL19 Dec 2016

Installation of closed circuit television (CCTV) cameras on 5m high poles at 3 no. locations in Meelin Village

Meelin Village Newmarket Co. Cork

12m
16/4969WITHDRAWN27 Apr 2016

Installation of closed circuit television (CCTV) cameras on 5m high poles at 3 no. locations in Meelin Village

Meelin Village Knockduff Upper Newmarket

41m
04/314CONDITIONAL23 Jan 2004

Demolition of dwelling and construction of dwelling house

Knockduff Upper Meelin Newmarket

94m
09/7062CONDITIONAL15 Sept 2009

Alterations and extensions to nursing home to include front and rear extensions with altered rear lounge area, upgrading of sewage treatment unit, internal road layout, car parking, outdoor recreational areas, landscaping and retention and completion of separate service block; drainage filter services location and vehicle entrance off L-5062 road.

Resthaven Nursing Home Meelin Knockduff Upper Newmarket

94m
09/5927REFUSED11 Jun 2009

Alterations and extensions to nursing home to include front extension to provide dining room, entrance lobby and enlarged kitchen area, extension to rear to provide additional bedrooms, altered lounge area and ancillary works

Resthaven Nursing Home, Meelin Knockduff Upper Newmarket

97m
15/6767CONDITIONAL7 Dec 2015

Permission for change of use of a former nursing home to residential care facility for up to 8 people. Permission also sought for use of the service block for accommodation, demolition of an existing extension to the rear, the construction of a new extension to the rear, alterations to the roof at the rear, removal of a window at first floor level on the rear elevation, a new door on the front and rear elevations, new wheelchair ramp at the south elevation, provision of 14 car spaces and 6 bicycle spaces, new fence and gate to enclose building, connection to pubic sewer and associated works. Retention for alterations to the windows along the front elevation, window at first floor level on the front elevation, provision of a boiler house to the rear, alterations to the windows along the south elevation, and the external stairs and door to storage area and service block and associated works

Meelin Knockduff Upper Newmarket Co. Cork

101m
23/5473CONDITIONAL18 Jul 2023

Permission for demolition of the existing single storey storage outbuildings to rear of the existing residential care facility. Construction of a new single storey pitched roof office and storage building to the rear of the existing care facility with new vehicle access. Extension of the existing carpark area to provide 6 no. additional carparking spaces. Relocation and extension of the existing external refuse area. Internal layout alterations for the addition of 3 no. bed spaces, ground works to allow for additional garden areas, and all associated internal & external works necessary to facilitate the development.

Cois Dalua, Meelin Knockduff Upper Newmarket Co. Cork

103m
19/4962CONDITIONAL17 Apr 2019

(i) Construction of a new two storey pitched roof extension with glazed link to the rear of existing residential care facility to cater for an additional 8 residents (ii) Extension of existing carpark area to provide 8 additional carparking spaces (iii) Installation of new waste water treatment plant to serve the new extension (iv) Decommission of existing waste water treatment percolation area (v) Installation of new raised sand/soil percolation area to serve both the new and existing waste water treatment plants (vi) all associated site works necessary to facilitate the development.

Meelin Knockduff Upper Newmarket Co. Cork

103m
19/4520INCOMPLETED APPLICATION4 Mar 2019

(i) Construction of a new storey two storey pitched roof extension with glazed link to the rear of existing residential care facility to cater for an additional 8 residents (ii) Extension of existing carpark area to provide 8 additional carparking spaces (iii) Installation of new waste water treatment plant to serve the new extension (iv) Decommission of existing waste water treatment percolation area (v) Installation of new raised sand / soil percolation area to serve both the new and existing waste water treatment plants (vi) all associated site works necessary to facilitate the development

Meelin Knockduff Upper Newmarket Co. Cork

103m
21/6028INCOMPLETED APPLICATION22 Jul 2021

Retention permission is sought for minor amendments/alterations of the development permitted under Cork County Council planning reg ref: 19/04962. The amendments/alterations include the following: (i) increase of previously permitted floor area of building from 462m2 to 508m2 (ii) change of orientation of extension (iii) alterations to all previously approved elevations of extension (iv) construction of new plant room to east elevation of extension (v) installation of new boundary treatments (vi) increase in height of previously approved boundary treatments (vii) widening of existing driveway entrance (viii) alterations to previously approved site and landscaping plan, and (ix) all associated and ancillary works to facilitate the changes.

Cois Dalua residential Care Facility Meelin Knockduff Upper Newmarket, Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?