← Back to search

Ballyleary Farm Cobh Co. Cork

INCOMPLETED APPLICATION

Planning application 16/6905

Cork - Cork County Council

Proposed Development

Retention of attic conversion, alterations to existing roof, first floor balcony, two storey extension to gable & conservatory to side of dwelling. Retention is also being sought for garage store and shed with ancillary glass house

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Nov 2016

  2. Decision due

    25 Jan 2017

Application Details

Location
Ballyleary Farm Cobh Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
22 November 2016
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
25 January 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
16/6561INCOMPLETED APPLICATION17 Oct 2016

To retain changes to existing dwelling including attic conversion, alterations to existing roof two-storey extension to gable and conservatory to side of dwelling. Retention is also being sought for a brick built garden store and garage with ancillary glass house.

Ballyleary Farm Cobh Co. Cork

0m
17/4746CONDITIONAL29 Mar 2017

Retention of attic conversion, alterations to roof, first floor balcony, two storey extension to gable and conservatory to side of dwelling. Retention also sought for garden store and shed with ancillary glasshouse, along with Permission to move waste water treatment system to north east corner of site

Ballyleary Farm Cobh Co. Cork

212m
17/4776CONDITIONAL3 Apr 2017

The construction of a new single storey extension to an existing single storey detached dwelling, the demolition of an existing single storey boiler house extension to the northern elevation and including all associated site works

The Cottage Ballyleary Farm Ballyleary, Cobh Co Cork

240m
16/5126CONDITIONAL11 May 2016

1.) The demolition of derelict farmhouse and disused ancillary farm building & 2.) The construction of a two and a half storey dwelling house, new waste water treatment system, raised solid polishing filter and all associated site works.

Ballyleary Farm Ballyleary Cobh Co. Cork

359m
21/6376CONDITIONAL30 Aug 2021

To construct a ‘storey and a half’ dwellinghouse, bio-treatment unit and new vehicular entrance, installation of a septic tank and percolation area, a domestic well and all ancillary works.

Ballyleary Cobh Co. Cork

411m
10/8824CONDITIONAL23 Dec 2010

Construction of 11 no. dwellings with an option of 4 no house types on each site (Change of house type, site layout and minor road alterations to part of residential development already granted under ref: 05/6541) and to include a proposed temporary vehicular entrance for access to the 11 no. dwellings.

Ballyleary Cobh Co. Cork

411m
10/8814WITHDRAWN23 Dec 2010

Construction of temporary vehicular entrance for access to 11 no dwellings, which is part of residential development granted under ref: 05/6541 and associated alterations to relevant estate road until such time as the main entrance is in place

Ballyleary Cobh Co. Cork

411m
15/6082CONDITIONAL17 Sept 2015

Construction of 11 no. dwellings with an option of 4 no house types on each site (Change of house type, site layout and minor road alterations to part of residential development already granted under ref: 05/6541) and to include a proposed temporary vehicular entrance for access to the 11 no. dwellings – Extension of duration of permission granted under planning ref: 10/8824

Ballyleary Cobh Co. Cork

446m
04/7759INCOMPLETED APPLICATION15 Oct 2004

Retention and continuation of use of 2.43 hectare os land as landfill for builders rubble, subsoil and topsoil

Ballyleary Cobh

446m
04/8022CONDITIONAL29 Oct 2004

Retention and continuation of use of 2.43 hectares of land as landfill for builders rubble, subsoil and topsoil to ultimately form agricultural land

Ballyleary Cobh

The submission window has closed

Observations on this application closed on Wednesday 4 January 2017, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?