Barnahely & Ballybricken Ringaskiddy Co. Cork
CONDITIONALPlanning application 16/7150
Cork - Cork County Council
Proposed Development
Consists of Site development works including
- (i)site excavation and regrading of the existing levels of that part of the site to the west of the existing Biologics facility and to the east of the on-site wind turbine
- (ii)the creation of new landscaped berms along the north western site boundary
- (iii)the relocation of 3no. existing single-storey 360m2 pre-fabricated temporary modular office units to the existing car park for a period of 5 years
- (iv)the erection of 1no. single-storey 360m2 pre-fabricated temporary modular office unit at the existing car park for a period of 5 years
- (v)the construction of 95no. temporary car park spaces, for a period of 5 years, to replace the car park spaces required to accommodate the temporary modular office units
- (vi)the relocation of 2no. existing fire water storage tanks and an existing firewater pump house to a location close to the southern boundary of the site as well as the creation of new landscaped berms along this boundary;
- (vii)all associated works, including modification of internal underground services and drainage at the existing facility at Barnahely, Ringaskiddy, Co. Cork. This application relates to development which comprises an activity which holds an Industrial Emissions Directive License (Reg. No. P0778-01).
Application Timeline
Application received
16 Dec 2016
Decision: CONDITIONAL
17 Feb 2017
Decision due
20 Feb 2017
Grant issued
27 Mar 2017
Application Details
- Location
- Barnahely & Ballybricken Ringaskiddy Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 16 December 2016
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 17 February 2017
- Grant Date
- 27 March 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erection of 2no. Single storey prefabricated temporary building units for a period of five years, consisting of 360sqm each of office accommodation ancillary to the existing office and production facility and all associated site works
Barnahely Ringaskiddy Co.Cork
Permission for construction of a new bulk caustic tank and tanker loading area at existing bio-pharmaceutical manufacturing facility. The development will comprise: 1) construction of bulk caustic tank to a height of approximately 6.4m above the established ground level, a diameter of approximately 3m and capacity of approximately 30,000 litres to be positioned within a concrete bund providing 110% capacity of the tank and to include steel maintenance gentry stairs, control unit and associated equipment concrete plinths, 2) construction of a tanker loading area of approximately 180 sqm, 3) extension by approximately 12m of the adjacent existing high level pipe rack (approximate height of 7.4m) and 4) associated drainage works, pipe connections and internal road reinstatement. This application relates to development which comprises an activity which holds an Industrial Emissions Directive licence (Reg. No. P0778-02).
Barnahely Ringaskiddy Co Cork
Permission for the construction of a new bulk caustic tank and tanker loading area at existing bio-pharmaceutical manufacturing facility. The proposed development will comprise: 1) Construction of bulk caustic tank to a height of approximately 6.4m above established ground level, a diameter of approximately 3m and capacity of approximately 30,000 litres to be positioned within a concrete bund providing 110% capacity of the tank and to include steel maintenance gantry stairs, control unit and associated equipment concrete plinths, 2) Construction of a tanker loading area of approximately 180sqm, 3) Extension by approximately 12m of the adjacent existing high level pipe rack (approximate height of 7.4m), 4) Associated drainage works, pipe connections and internal road reinstatement. The proposed development is located on lands of approximately 3,650sqm within the existing manufacturing campus. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg.No. P0778-02). The application is for a development in a site to which the Major Accident Regulations apply.
Barnahely Ringaskiddy Co Cork
Biopharmaceutical manufacturing facility comprising of 3 storey manufacturing building with plant room, 4 storey laboratory/administrative building with gas bottle storage area, single storey warehouse building with mezzanine including shipping and receiving area, covered waste management centre, offices, quality control area, ethanol solution preparation and plant areas and loading docks, single storey central utilities plant bulding with mezzanine, workshop and offices, heat and power plant with 30 m high stack ,boilers and two transformers, utility yard comprising of cooling towers, generators, diesel, chemical and water tanks, pumps etc, fire fighting water storage tanks with pump house, AGI to regulate natural gas supply, waste water treatment plant with adjoining 2 storey building with office use, laboratory, plant rooms, sludge treatment and collection and associated treatment tanks,pumps and pipe bridge and 10 m high stack, ancillary and associated site works.
Barnahely Ballybricken Ringaskiddy
Construction of a new service road 1.2km and 7.5m wide traversing the site from East to West and the upgrading of 2 no. site entrances. It will also consist of 110kv, 38kv, 10kv power lines and site landscaping
Barnahely Ballybricken Shanbally Ringaskiddy
An extension to the existing biomedicines manufacturing facility (proposed gross floor area c. 19,116sq.m), including (i) a new part single-storey, part two-storey over basement production building, including mezzanine floors (c.11.054sq.m and maximum height 24.45m); (ii) 3 no extensions to the existing warehouse building (c.4,890sq.m and maximum height 18.2m), to include a new part single-storey, part two-storey waste management and dispensing area; a new single-storey high bay warehouse; a new single-storey finished goods area; and a single storey extension to the existing link corridor to connect the proposed production building with the existing facility; (iii) a new four-storey extension to the existing administration and laboratory building, including a single-storey extension to the existing cafeteria (c. 3,100sq.m and maximum height 22.2m); new single-storey drum store (c. 72sq.m and maximum height 6.15m); (iv) extension to the existing on site waste water treatment plant; (v) 325 no. car parking spaces, 33 no. motorcycle spaces and 72 no. cycle spaces; (iv) all associated site development landscaping and ancillary works, including all internal services, attenuation tank, roads yards, 1 no. new cooling tower, 1 no. new diesel generator and pipe racks at the existing facility. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. PO778-01). An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development.
Barnahely Ringaskiddy Co. Cork
The erection of 2No. temporary single storey modular buildings with a total gross floor area of c.504m2. The temporary buildings will be required for a maximum period of three years. The temporary buildings will comprise; (i) a gowning and locker building of c.276m2 and maximum height of c.4.15m connected to the northern end of the existing production building P02, and (ii) an office and break room building of c.228m2 and maximum height of c.4.15m connected by covered walkway to the southern end of the existing production building P02. The development will include local site works, footpaths and underground service connections. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg No.P0778-02)
Barnahely Ringaskiddy Co. Cork
The construction of building extensions with a total gross floor area of c.2,734m2 at the existing facility. The building extensions will comprise; (i) a 2-storey extension to the west elevation of existing production building P02 of c.1,003m2 and maximum height of 22.2m; (ii) demolition of an existing single-storey entrance lobby and construction of a 2-storey extension to the east elevation of existing production building P02 of c.480m2 and maximum height of 12.2m; (iii) a single-storey in-fill extension to the north elevation of existing production building P02 of c.50m2 and maximum height of 8m; (iv) a single-storey break-room extension to the south elevation of existing Production Building P02 of c.316m2 and maximum height of 8.2m; (v) a single-storey extension to the north elevation of existing CUP Building of c.500m2 and maximum height of 14.2m; and (vi) a single-storey extension to the east elevation of the existing warehouse building of c.385m2 and maximum height of 18.2m. The development will include local site road, footpaths and underground service connections. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg No.P0778-02)
Barnahely Ringaskiddy Co. Cork
Construction of boiler room and container storage space for Biomass (wood chip) Boiler as part of carbon dioxide emission reduction programme
Barnahely Ringaskiddy
The proposed development will consist of: 1. Temporary permission for 5-years for the continuation of use of 2 No. existing single storey modular construction Office Buildings (Buildings No’s. 8 and 9) comprising a floor area of c. 48.5 sqm each (c. 97.0 sqm total floor area), and each with max. height of c. 2.7 meters, at south-eastern part of the campus. 2.Temporary permission for 5-years for the continuation of use of 2. No. existing single storey modular construction office/workshop Buildings (Buildings No’s. 13 and 14) comprising a floor area of c. 45.0 sqm each (c. 90.0 sqm total floor area) and each with max. height of c. 2.7 meters, at northern part of the campus. 3. Permanent Permission for the modular production support building (former Gowning Room) granted temporary permission under Reg. Refs. 21/5786 & 24/5501 for continued production support activity with building max. height of c. 3.76m, to include an increase of floor space by c. 7.0 sqm to provide a gross floor area total of c. 283 sqm, ancillary plant for air conditioning and air handling units, and a minor adjustment of the building’s position relating the connection corridor to Production Building P02. This application relates to development, which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-03).
Johnson & Johnson Innovative Medicine, Barnahely, Ringaskiddy, Co. Cork, P43 FA46
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?