Planning application 17/4071

Cork - Cork County Council

Proposed Development

The development will consist of the following works at the existing IE08 production building:

  1. (1)
    Demolition of
    1. (a)
      an existing single-storey section (gross floor space 26.9m2) of the building
    2. (b)
      of an existing storage room at first floor level (gross floor space 11.6sqm)
    3. (c)
      of an existing single-storey drum heating shed (gross floor space 25.9sqm) adjacent to the south of the building (total area for demolition is 64.4sqm)
  2. (2)
    The construction of
    1. (a)
      a new single storey extension of gross floor space 78m2 and height not exceeding 4.9m
    2. (b)
      a new three storey extension of gross floor space 250.2m2 and total height not exceeding 15.8m, to be constructed in 2 phases (total new floorspace is 328.2sqm)
  3. (3)
    The provision of a new internal lobby (gross floor space 34sqm) including alterations to the existing western elevation to provide a new entrance
  4. (4)
    All associated internal modifications to facilitate the 2 no. new extensions and the new internal lobby;
  5. (5)
    All associated site development works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Jan 2017

  2. Decision: CONDITIONAL

    9 Mar 2017

  3. Decision due

    13 Mar 2017

  4. Grant issued

    18 Apr 2017

Application Details

Location
Ballythomas East, Ballythomas West, Horsehill More Dunderrow Kinsale Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
17 January 2017Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 March 2017
Grant Date
18 April 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

38m
25/5133Conditional Permission12 Jun 2025

Permission to construct a Biomass Steam Boiler Facility that includes: A) Demolition of existing single storey temporary warehouse building. B) Construction of single storey building with parapet height of 20.3m with part mezzanine floors within. C) A chimney stack with height of 23.15m. D) Above ground pipe rack measuring 55m long x 3.5m wide with an overall height of 11.58m. E) Underground services, drainage and other associated site development works. The proposed development is covered by an existing Industrial Emissions (IE) Directive Licence No. P0009-05 under Part IV of the Environmental Protection Agency Act 1992 (as amended). The proposed development refers to a modification to an establishment to which Major Accident Regulations applies.

Ballythomas East, Ballythomas West, Horsehill More North and Ballyvrin Lower, Dunderrow, Kinsale, Co. Cork.

200m
25/4269INCOMPLETED APPLICATION21 Feb 2025

Permission for construction of an expansion to the existing waste water treatment plant, that includes (a) three number buildings consisting of (1) a single storey precipitation building (8.6m high) that including an open storage area, (2) single storey electrical building (5.4m high), (3) two storey filter press building (9.6m high), (b) process vessels and associated access stairs and platforms, (c) structural steel service racking, (d) underground services, drainage and other associated siteworks. The proposed development is covered by an existing industrial emissions (IE) licence no. P0009-05. The development refers to a modification to an establishment to which a major accident regulation applies.

Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow Kinsale, Co.Cork

288m
16/4320INCOMPLETED APPLICATION16 Feb 2016

(1) A new external boiler flue of height not exceeding 21m above ground level adjacent to the existing IE04 building, (2) Construction of a new external support platform of height not exceeding 9.15m above ground level around the new boiler flue. All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an Establishment to which the Major Accidents Directive applies.

Ballythomas East, Ballythomas West Horsehill More, Dunderrow Kinsale Co. Cork

288m
16/4799UNCONDITIONAL12 Apr 2016

(1) A new external boiler flue of height not exceeding 21m above ground level adjacent to the existing IE04 building, (2) Construction of a new external support platform of height not exceeding 9.15m above ground level around the new boiler flue, and all associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an Establishment to which the Major Accidents Directive applies.

Ballythomas East, Ballythomas West Horsehill More Dunderrow Kinsale

336m
14/6065CONDITIONAL1 Oct 2014

Demolition of existing idled IE3 Production building and ancillary plant and equipment

Ballythomas East, Ballythomas West Horsehill More Dunderrow Kinsale

358m
23/5763CONDITIONAL30 Aug 2023

Permission for the construction of a pedestrian footbridge across an existing stream within the Eli Lily pharmaceutical facility, and associated works. The bridge will have a length of approx. 17.9m (13.1 span plus landing areas of 2.4m at either end) and a two-way 2.4m wide walkway and will be located on a site area of approx. 0.23ha. The application site falls within the Eli Lilly industrial complex, which operates under an Industrial Emissions (IE) licence (P0009-04) under part IV of the Environmental Protection Agency Act 1992 (as amended by the protection of the Environmental Act, 2003) and is also an establishment to which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies

Eli Lilly Pharmaceutical Complex Ballythomas East & Ballythomas West Dunderrow Kinsale, Co. Cork

358m
23/5673INCOMPLETED APPLICATION16 Aug 2023

Permission for the construction of a pedestrian footbridge across an existing stream within the Eli Lilly pharmaceutical facility, and associated site works. The bridge will have a length of approx. 17.9m (13.1m span plus landing areas of 2.4m at either end) and a two-way 2.4m wide walkway and will be located on a site area of approx. 0.23ha. The application site falls within the Eli Lilly industrial complex, which operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) and is also an establishment to which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.

Eli Lilly Pharmaceutical Complex Ballythomas East & Ballythomas West Dunderrow Kinsale Co Cork

511m
24/4715CONDITIONAL24 Apr 2024

Permission for a) A 15.3m high two storey cold storage building, comprising of cold storage warehousing and freezer storage, dock leveller, goods in and out areas with associated mechanical and electrical room on the first floor b) Single storey sub-station, c) Structural steel service racking, d) All road circulation, underground services, drainage and other associated site works. The proposed development is covered by an existing Industrial Emissions (IE) Licence No. P0009-05. The development refers to a modification to an establishment to which a Major Accident Regulation applies.

Ballythomas East Ballythomas West Horsehill More North & Ballyvrin Lower Dunderrow Kinsale Co Cork

545m
03/2560CONDITIONAL29 May 2003

Dwellinghouse

BALLYTHOMAS EAST, BALLYTHOMAS EAST,

584m
23/6601INCOMPLETED APPLICATION21 Dec 2023

Permission for construction of a 2.5 metre wide artificial running track to the perimeter of an existing grassed area adjacent to the main security entrance and a set-down parking area offset from the existing entrance road for 4 vans and 5 cars along with 4 disability parking spaces to include the provision of an electric vehicle charging point and an illuminated directional sign at the entrance to the set-down parking area. The development will include all site works including the provision of underground services and hard landscaping. The proposed development is covered by an existing Industrial Emissions (IE) Licence No. P0009-05. The development refers to a modification to an establishment to which the Major Accident Regulations applies.

Ballythomas East, Ballythomas West, Horsehill More North and Ballyvrin Lower, Dunderrow, Kinsale Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?