Proposed Development
Construct a cattle house with 2 no. slatted slurry tanks, 2 no. concrete aprons, extend existing walled silo and carry out associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
25 Jan 2017
Decision: CONDITIONAL
20 Mar 2017
Decision due
21 Mar 2017
Grant issued
19 Apr 2017
Application Details
- Location
- Farranhavane Bandon Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 25 January 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 20 March 2017
- Grant Date
- 19 April 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a dwelling house, domestic garage, on-site waste water treatment system and percolation area and all associated site works.
Farranhavane Bandon Co Cork
Construction of dwellinghouse, garage and all associated site works
Farranhavane Bandon Co. Cork
The construction of a dwelling-house, domestic garage, on-site waste water treatment system and percolation area and all associated site works
Farranhavane Bandon Co.Cork
Construction of cattle underpass beneath the public road and all associated site works
Farranhavane Bandon Co.Cork
Installation of proprietary treatment unit
St. Martin's RC Chapel Farranhavane Bandon
Demolition of derelict dwelling and construction of slatted cubicle house, straw bedded calf house, dungstead, isolation boxes and associated works
Farranhavane Bandon
Demolition of existing attached garage (16.64 square metres) and modifications and extension to existing house to include: [a] removal of existing porch canopy from east facing elevation, [b] construction of 2.13 square metre porch and installation of 2 no. rooflights to east-facing elevation, [c] construction of 29.86 square metre (total floor space) two storey extension to north-facing elevation, [d] construction of 22.68 square metre single storey extension and replacement of existing rooflight with 2 no. rooflights to west elevation, [e] replacement of uPVC cladding on all dormer windows with smooth plaster, [f] replacement of all dormer glasing with new glazing and all ancillary works
"Ard-Martha" Farranhavane Bandon
Retention of alterations, extension, and porch all to existing dwelling (change of plan from that permitted under PL. Reg. No. 11/6111), and all ancillary works.
Ard-Martha Farranhavane Bandon Co. Cork
Demolition of garage and construction of garage/storage loft and alterations and extension to dwellinghouse
Farranhavane Bandon
Retention and completion of dwellinghouse
Farranhavane Bandon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?