← Back to search

Glasslyn Road DRI Glasslyn Road Cloghmacsimon, Bandon Co. Cork

CONDITIONAL

Planning application 17/4611

Cork - Cork County Council

Proposed Development

The development will consist of the installation of a 3 m high ‘lamp post’ style relief vent stack servicing the existing above ground natural gas pressure reduction unit with all ancillary services and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Mar 2017

  2. Decision: CONDITIONAL

    4 May 2017

  3. Decision due

    9 May 2017

  4. Grant issued

    12 Jun 2017

Application Details

Location
Glasslyn Road DRI Glasslyn Road Cloghmacsimon, Bandon Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
15 March 2017Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 May 2017
Grant Date
12 June 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

156m
03/3064REFUSED23 Jun 2003

Construction of two storey headquarters building with ancillary banking hall, assoc. landscaping and car parking

GLASSLYN ROAD, GLASSLYN ROAD, CLOGHMACSIMON URBAN,

314m
03/6545CONDITIONAL18 Dec 2003

Demolition of existing extension to rear, construction of 3 storey extension to rear consisting of offices and ancillary rooms, retention of change of use to existing 1st and 2nd floors from residential use to use as financial services and provision of new doorset in existing shopfront at ground floor

19-20 South Main Street Bandon

416m
05/3272CONDITIONAL13 May 2005

Change of use from retail to restaurant and to carry out internal alterations

Unit no. 2 Market Street Gully Bandon

416m
05/2685WITHDRAWN25 Apr 2005

Alterations and change of use of retail unit to restaurant

Unit No. 1 Market Street Gully Bandon

416m
03/2695CONDITIONAL4 Jun 2003

Subdivision of supermarket to 4 no. retail units & change of use from plant room/stores to new retail unit, rear access passage ways & new shop front

MARKET STREET, MARKET STREET, GULLY RURAL,

454m
24/5147Conditional Permission20 Jun 2024

Permission for the construction of a new single storey childcare/creche facility including, bike store, bin store, associated parking and new entrance to Cork Road along with site and ancillary works.

Knockbrogan Bandon Co. Cork

465m
26/0337Grant with Conditions13 Feb 2026

The proposed development will consist of modifications to the development granted under Application Register Reference 24/5272 to comprise: (1) A 238sqm single storey extension to the western side of the permitted showrooms. (2) Two new entrance lobbies with canopies over to front. (3) A new totem sign (6.65m x 1.5m). (4) The rearrangement of the permitted internal layout to consolidate office and administrative areas, with associated elevational changes to side and rear. (5) All associated servicing, drainage and site and development works.

Site at Irishtown, bound by Glasslyn Road to the north,, the Bandon Relief Road/ N71 to the east and Connolly Street to the south, in Bandon, Co. Cork,, P72 Y499

511m
24/5272Conditional Permission8 Jul 2024

Permission for (1) redevelopment of existing car showroom building to include partial demolition works (463.5 sqm) and stripping back and removal of cladding and glazing and construction of a new single storey rear extension (340.9 sqm) resulting in a net decrease in floor area of 122.6sqm, and new cladding, glazing and signage throughout; (2) redevelopment of existing car servicing building to include partial demolition works, including separate prefabricated structure adjacent (289.8sqm + 39.2sqm) and construction of 2 no. new extensions (325.2sqm) resulting in a net increase of floor area of 35.4sqm, with new roof and elevational changes including new signage; (3) site layout changes adjacent to these buildings to include new car display spaces and formalisation of other parking areas, including footpaths and kerbing; (4) construction of an ESB substation and, (5) all associated servicing, drainage and site and development works.

Irishtown, bound by Glasslyn Road to the north The N71/Bandon Relief Road to the east and Connolly Street to the south in Bandon Co.Cork P72 Y499

540m
08/6674INCOMPLETED APPLICATION13 May 2008

Construction of two storey extension to existing light industrial building incorporating proposed storage areas, offices and workshop areas, which will be ancillary to use of existing building i.e maintenance, storage and assembly of pianos and all associated site works

Site No.2 Cloghmacsimon Bandon

540m
08/7056CONDITIONAL3 Jun 2008

Construction of two storey extension to existing light industrial building incorporating proposed storage areas, offices and workshop areas ancillary to use of existing building i.e maintenance, storage and assembly of pianos and all associated site works

Site No.2 Cloghmacsimon Bandon

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?