Little Island Industrial Estate Ballytrasna Little Island Co.Cork
CONDITIONALPlanning application 17/4646
Cork - Cork County Council
Proposed Development
Increasing the floorspace and raising the height of an existing structure utilised for food processing, together with associated elevational changes and ancillary site works. It is proposed to increase the floorspace of the structure by a total of approximately 210m2 by: constructing new first and second floors in the North-Western annex of the building of approximately 82m2 each; constructing an extension comprising a new stairwell to access the new floors comprising of approximately 16m2; and constructing an extension comprising a new ground floor workshop of approximately 30m2. The height of the structure will increase by approximately 5.5m from 8.6m to 14.075m. All on a site of approximately 0.96 hectares
View the full application file on the council's planning portal →Application Timeline
Application received
22 Mar 2017
Decision: CONDITIONAL
15 May 2017
Decision due
16 May 2017
Grant issued
20 Jun 2017
Application Details
- Location
- Little Island Industrial Estate Ballytrasna Little Island Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 22 March 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 May 2017
- Grant Date
- 20 June 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of revisions to previously permitted development under Pl. Reg. No. 11/6227 to omit Condition No.7. The development granted under Pl. Reg. No. 11/6227 comprised of the construction of a specialised confectionary powder blending facility comprising of a two storey processing factory unit (including ESB substation and an ancillary 3-storey office and administration element all located within one block (total 4,208 sq.m.); truck loading bay; associated plant and storage facilities; single storey pump house (total 77sq.m); water storage tank; generator and oil tank compound; waste buffer tank; associated signage; AGI gas metering station; 85 no. parking spaces; vehicular access to site via existing access to former Swissco site and HGV access via existing access to existing PepsiCo 'Lee Building' site; visitor set down area; associated site development and landscaping works; all on a site of 2.263 hectares.
Little Island Industrial Estate Ballytrasna Little Island Co. Cork
The development will consist of a revision to previously permitted development under Reg. Ref. 11/6227 to omit Condition No. 7 which restricts the hours and days of operation and operations/deliveries of the proposed facility. The development granted under Reg. Ref. 11/6227 comprised of the construction of a specialised confectionary powder blending facility comprising of a two storey processing factory unit (including ESB substation) and an ancillary 3-storey office and administration element all located within one block (total 4,208 sq.m.); truck loading bay; associated plant and storage facilities; single storey pump house (total 77sq.m); water storage tank; generator and oil tank compound; waste buffer tank; associated signage; AGI fas metering station; 85 No. parking spaces; vehicular access to site via existing access to former Swissco site and HGV access via existing access to existing PepsiCo 'Lee Building' site; visitor set-down area; associated site deveopment and landscaping works; all on a site of 2.263 hectares
Little Island Industrial Estate Ballytrasna Little Island Co. Cork
The development comprises a modified and reduced scale design to that previously permitted under Pl. Reg. No. 11/6227 and Pl. Reg. No. 12/4450, all now to comprise as follows: the construction of a specialised confectionary powder blending facility comprising of a two storey processing factory unit (including ESB substation) and an ancillary office and administration element all located within one block (total 3,740 sq.m.); truck loading bay; associated plant and storage facilities; single storey pump house (total 77sq.m); water storage tank; generator and oil tank compound; waste buffer tank; associated signage; AGI gas metering station; 85 No. parking spaces; vehicular access to site via existing access to former Swissco site and HGV access via existing access to existing PepsiCo ‘Lee Building’ site; visitor set-down area; associated site development and landscaping works; all on a site of 2.263 hectares.
Little Island Industrial Estate Ballytrasna Little Island Co. Cork
The development will consist of: construction of a specialised confectionary powder blending facility comprising of a two storey processing factory unit (including ESB substation) and an ancillary 3-storey office and administration element all located within one block (total 4,208 sq.m.); truck loading bay: associated plant and storage facilities; single storey pump house (total 77sq.m.) water storage tank; generator and oil tank compound; waste buffer tank; associated signage; AGI gas-metering station; 85 no. parking spaces; vehicular access to site via existing access to former Swissco site and HGV access via existing access to existing PepsiCo ‘Lee Building’ site; visitor set-down area; associated site development and landscaping works all on a site of 2.263 hectares
Little Island Industrial Estate Ballytrasna Little Island
Extension to food processing factory, 2 no. entrances and modifications to effluent treatment plant
BALLYTRASNA, BALLYTRASNA,
Demolition of 2 no. disused commercial buildings and associated ancillary structures and associated site development and clearance works
Little Island Industrial Estate Ballytrasna Little Island
Construction of an expansion to the existing production building to provide an additional 3,252sqm floor space, over 4 no. operational levels to maximum height of 28.1 meters. To include ancillary and associated works comprising: (i) construction of approximately 200 sqm of new concrete pavement at the south west corner of the proposed building and regarding of approximately 120sqm of existing concrete paving at existing site entrance on the north east corner of the proposed building. (ii) decommissioning and demolition of an existing underground surface water attenuation tank adjacent to the existing food flavours building which requires the temporary removal and later reinstatement of car parking space adjacent to the tank. (iii) all associated site development works, landscaping and underground services provisions with an overall site area of 1.07 ha, including the provision of underground pipe connections to an existing underground tank for surface water management.
Little Island Industrial Estate Ballytrasna Little Island Co.Cork
Construction of a storage unit for storage of electrical equipment and associated site works
Ballytrasna Little Island
Storage unit
Ballytrasna Little Island
(a) The construction of 3348m2 two storey warehouse including yard canopy and covered ramp, (b) the construction of a 186m2 single storey building for the recycling of packaging materials and (c) all associated drainage and site works.
Little Island Business Park Ballytrasna Little Island Co.Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?