Ballinrea Carrigaline Co.Cork

Conditional Permission

Planning application 17/6784

Cork - Cork County Council

Proposed Development

A solar farm consisting of circa 159,100 m2 of solar panels on ground mounted frames, 1 no. substation, 10 no. single storey inverter/transformer stations, battery storage module and associated equipment building, security fencing, satellite pole, CCTV and all associated ancillary development works. Construction and operational access to the site will be via the existing entrance from the L2464.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Nov 2017

  2. Decision due

    24 Oct 2018

  3. Decision: Conditional Permission

    24 Oct 2018

Application Details

Location
Ballinrea Carrigaline Co.Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
1 November 2017
Status
Application Closed
Decision
Conditional Permission
Decision Date
24 October 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
17/6617INCOMPLETED APPLICATION9 Oct 2017

A solar farm consisting of circa 159,100 m2 of solar panels on ground mounted frames, 1 no. substation, 10 no. single storey inverter/transformer stations, battery storage module and associated equipment building, security fencing, satellite pole, CCTV and all associated ancillary development works. Construction and operational access to the site will be via the existing entrance from the L2464.

Ballinrea Carrigaline Co.Cork

73m
23/4563Conditional Permission29 Mar 2023

Modifications to the permitted solar farm (Pl. Ref. No.: 17/6784, ABP Ref. PL04.303013). The modifications are within the boundary of the permitted development and will consist of: i) Changes to the layout and dimensions of the permitted solar photovoltaic layout which will decrease the solar photovoltaic footprint from c. 159,100 sq.m of solar panels, to c. 145,000 sq.m of solar panels on ground mounted frames (this modification is to allow for the inclusion of a proposed 110kV substation and grid connection which will be subject to a separate application); ii) Amendments to the internal track layout and the removal of the permitted battery storage unit; iii) 6 no. single storey inverter/transformer stations (reduced from 10 no. permitted inverter/transformer stations). Permission is also sought for the provision of a 33kV internal network cable (c. 3,760m underground with c. 114m of overhead line) linking the Ballinrea solar farm with the Ballinvuskig solar farm (c. 1.74 km to the northwest). The proposed development includes all associated site works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and the NIS will be submitted to the Planning Authority with the application.

Ballinrea Ballinreeshig Kilnahone near Carrigaline Co. Cork

205m
08/8807CONDITIONAL9 Sept 2008

Construction of cubicle house, slatted channel, lined lagoon and associated works

Ballinrea Carrigaline

263m
21/4245CONDITIONAL5 Feb 2021

The construction of a single dwelling house, the construction of a detached domestic garage, the closure of the existing site entrance, the construction of a new site entrance, the installation of a new connection to public water mains, the installation of a wastewater treatment unit and associated raised soil polishing filter, and all ancillary works.

Ballinrea Carrigaline Co. Cork

265m
21/7371CONDITIONAL16 Dec 2021

Construction of a dwelling house, a garage for domestic purpose, installation of a domestic water treatment system, construction of a new vehicular entrance and to carry out all associated site works.

Ballinrea Carrigaline Co.Cork

295m
20/4150REFUSED31 Jan 2020

Dwelling house and all associated site development works.

Ballinrea Carrigaline Co. Cork

295m
19/6802INCOMPLETED APPLICATION22 Nov 2019

Dwelling house and all associated site development works.

Ballinrea Carrigaline Co. Cork

298m
08/6837REFUSED21 May 2008

Dwellinghouse and installation of wastewater treatment unit

Ballinrea Carrigaline

381m
07/6100CONDITIONAL15 Mar 2007

Construction of livestock housing with slatted tank and associated works

Ballinrea Carrigaline

412m
10/6199CONDITIONAL3 Sept 2010

Construction of ground and first floor dormer extension to side, front and rear of dwellinghouse

"Avalon" Ballinrea Carrigaline