61 Deerpark Gully Bandon Co Cork
INCOMPLETED APPLICATIONPlanning application 17/7307
Cork - Cork County Council
Proposed Development
Retention of the two storey side extension and completion of the single storey rear extension to their property.
Application Timeline
Application received
18 Dec 2017
Decision due
20 Feb 2018
Application Details
- Location
- 61 Deerpark Gully Bandon Co Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 18 December 2017Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 20 February 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Replacement of 4no. bungalows, permitted under planning ref.no. 04/5055, with 4no. detached dormer dwellings & all other assoociiated site works
Castleoaks Gully Bandon
Replacement of 4 no. bungalows permitted under Reg. No. 04/5055 with residential development of 8 no. dormer style semi-detached dwellings and all amended associated site works
Castleoaks Gully Bandon
Alterations to the site layout for the removal of 4no. single storey bungalow dwellings previously permitted under planning ref.no. 04/5055 & permission for construction of 4no. detached dormer dwellings & associated site works
Castleoaks Gully Bandon
Alterations to previously permitted creche building to include the inclusion of 3 no. apartments over and alterations to elevations, replacement of 4 no. proposed bungalows with 8 no. dormer style semi-detached dwellings and modifications to all associated site works
Castleoaks Gully Bandon
Permission for a) the demolition of an existing shed, b) the construction of eight townhouses fronting onto o'Mahony Avenue (total of eight 3-bedroom split level dwellings), c) the construction of two new vehicular entrance for a new one way vehicular access road, d) lay by parking, open area, new retaining walls to rear of site, boundary treatment and all associated site works.
Upper O'Mahony Avenue, Bandon, Co.Cork
Permission for a) the demolition of an existing shed, b) the construction of eight townhouses fronting onto O'Mahony Avenue (total of eight 3-bedroom split level dwellings), c) the construction of two new vehicular entrances for a new one way vehicular access road, d) lay by parking, open area, new retaining walls to rear of site, boundary treatment and all associated site works.
Upper O'Mahony Avenue, Gully, Bandon, Co.Cork
Permission for change of design of dwelling house, as granted under planning permission reg. number 23/5780, permission for domestic garage and all associated site works. The site is within the grounds of Oaklands House, which is a protected structure.
Oaklands, Gully, Bandon, Co Cork
The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, which is a protected structure.
Oaklands Gully Bandon Co. Cork
The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, which is a protected structure.
Oaklands Gully Bandon Co. Cork
Permission for the construction of 22 no. residential units, comprising 8 no. 3-bedroom terraced houses, 2 no. 2-bedroom terraced houses, 6 no. 2-bedroom duplex apartments, and 6 no. 3-bedroom duplex apartments. The development also includes the part demolition of an existing wall, access arrangements, boundary treatments, and all associated landscaping and ancillary site development works
Gully Bandon Co.Cork
The submission window has closed
Observations on this application closed on Tuesday 30 January 2018, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?