Barr na Claise Laherfineen Innishannon Co. Cork
CONDITIONALPlanning application 18/5001
Cork - Cork County Council
Proposed Development
Retention and completion of residential development of 18 no. houses (change of plan from that permitted under Planning Reg. No. 05/9838 and extended under 14/5861) and alterations to the site layout which involves the relocation of 2 no. previously permitted turning bays
Application Timeline
Application received
23 Apr 2018
Decision due
18 Jun 2018
Decision: CONDITIONAL
18 Jun 2018
Grant issued
25 Jul 2018
Application Details
- Location
- Barr na Claise Laherfineen Innishannon Co. Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 April 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 June 2018
- Grant Date
- 25 July 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
To complete alterations to house no’s 1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 14, 15, 17, 18, 19, 20 and 21 which are currently under construction (permitted by application reference 05/9838 as extended under application reference 14/5861). The proposed alterations include the construction of two storey rear extensions to house no’s 1, 2, 3, 4, 5, 6, 12, 14, 19 and 20, single storey side and front extensions to house no’s 7, 8, 9, 11, 15, 17, 18, and 21 and elevational changes. The proposed development also makes provision for alterations to the site layout which involves the relocation of 2 no. previously permitted turning bays.
Barr na Claise Laherfineen Innishannon Co. Cork
Installation of a balcony (4.5m x 1.8m) to the side of the dwelling. The balcony will be accessed from an independent external stair.
17 Dromkeen View Laherfineen Innishannon Co Cork
Alterations to existing dormer bungalow dwelling to include a 10.8 sq metre single storey kitchen extension to rear, new windows and doors and the removal of 3 pitched roof dormers to the front of the dwelling to be replaced with 2 larger flat roof dormers.
1 The Spires Laherfineen Innishannon Co. Cork
The construction of a two storey detached dwelling house. The proposed development will be accessed via the existing access road to the Barr na Claise residential development which was permitted under application reference 05/9838 and extended under application reference 14/5861
Barr na Claise Laherfineen Innishannon
Construction of extensions to dwellinghouse to include sun-room, garage and first floor accommodation
No.33 The Spires Laherfineen Innishannon
Retention of alterations, garage conversion and porch extension to dwelling
33 The Spires Laherfineen Innishannon
Permission for an extension to the front elevational and internal alterations to existing dwelling house and all associated site works
33, The Spires, Innishannon, Cork, T12DW6Y
Construction of 91 no. dwellinghouse comprising of 19 no. detached dwellings, 52 no. semi-detached dwellings, 20 no. terraced dwellings, 1 no. recycling facility, 1 no. ESB substation, playing pitch, 1 no. temporary waste water treatment unit, 2 no. temporary pumping stations and all associated site works, extension of duration to permission granted under Planning Ref. No. 05/9838
Barr na Claise Laherfineen Innishannon Co.Cork
Construction of 91 no. dwellinghouse comprising of 19 no. detached dwellings, 52 no. semi-detached dwellings, 20 no. terraced dwellings, 1 no. recycling facility, 1 no. ESB substation, playing pitch, 1 no. temporary waste water treatment unit, 2 no. temporary pumping stations and all associated site works
Laherfineen Innishannon
Extension to dwellinghouse, construction of garage and boundary fence