Ballymaquirke Kanturk Co. Cork

INCOMPLETED APPLICATION

Planning application 18/5188

Cork - Cork County Council

Proposed Development

Retention of

  1. (1)
    house and garage as constructed
  2. (2)
    altered site boundaries
  3. (3)
    relocated septic tank
  4. (4)
    all associated site works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 May 2018

  2. Decision due

    4 Jul 2018

Application Details

Location
Ballymaquirke Kanturk Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
10 May 2018
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
4 July 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18/4809INCOMPLETED APPLICATION4 Apr 2018

(1) Retention of house as constructed and (2) revision of site boundaries.

Ballymaquirk Kanturk Co. Cork

6m
18/5817INCOMPLETED APPLICATION11 Jul 2018

1) A new percolation area to serve existing septic tank, 2) the retention of house and garage as constructed 3) the retention of altered site boundaries, 4) the retention of the relocated septic tank and 5) the retention of all associated site works.

Ballymaquirke Kanturk Co. Cork

8m
18/6109CONDITIONAL10 Aug 2018

Permission for: - (1) New percolation area to serve existing septic tank and revised site boundaries to include enlargement of site area, (2) Retention of: - (a) house and garage as constructed (b) altered site boundaries (c) relocated septic tank (d) all associated site works.

Ballymaquirk Kanturk Co. Cork

101m
14/5593INCOMPLETED APPLICATION23 Jul 2014

Wastewater treatment plant and polishing filter to be provided in place of the existing septic tank system and for additional car parking to be provided to the front of the factory building.

Ballymaquirk Kanturk Co.Cork

101m
14/5735CONDITIONAL14 Aug 2014

A new waste water treatment plant and polishing filter to be provided in place of the existing septic tank system and for additional car parking to be provided to the front of the factory building

Ballymaquirk Kanturk Co Cork

117m
24/6422Application Withdrawn18 Dec 2024

Permission for the construction of a single-storey substation to serve an existing industrial building and all associated site development works.

Ballymaquirk Kanturk Co Cork P51 XW94

118m
26/2605Awaiting Admin Validation8 Oct 2026

the extension and alterations to an existing service yard serving an existing industrial building. The development will consist of the retention of (i) a concrete area surrounding the existing industrial building; (ii) the extension of the existing yard for use as outdoor storage; (iii) security perimeter fencing; (iv) sliding entrance gate; (v) surface water drainage infrastructure, including concrete and cellular attenuation tanks; and (vi) all associated site development works.

Ballymaquirk, Kanturk, Co. Cork, P51 XW94

118m
26/2604Awaiting Admin Validation8 Oct 2026

the construction of a single-storey substation to serve an existing industrial building and all associated site development works.

Ballymaquirk, Kanturk, Co. Cork, P51 XW94

312m
21/6765CONDITIONAL12 Oct 2021

Permission for the retention of (a) the demolition of factory building (factory 1), (b) retention of the construction of factory building (factory 1) and (c) retention of the construction of a loading mechanism (gantry crane) all within an overall site of 32.80 acres.

Ballymaquirk Kanturk Co. Cork

314m
20/6120INCOMPLETED APPLICATION29 Sept 2020

Retention of (a) the demolition of factory building (factory 1), (b) retention of the construction of factory building (factory 1) and (c) retention of the construction of a loading mechanism (gantry crane) all within the overall site of 32.80 acres.

Ballymaquirk Kanturk Co. Cork

The submission window has closed

Observations on this application closed on Wednesday 13 June 2018, five weeks after it was received. The authority cannot accept a late submission.