Moanroe Ladysbridge Co. Cork

CONDITIONAL

Planning application 18/5927

Cork - Cork County Council

Proposed Development

Construction of a single storey domestic dwelling, septic tank and associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Jul 2018

  2. Decision due

    17 Sept 2018

  3. Decision: CONDITIONAL

    17 Sept 2018

  4. Grant issued

    25 Oct 2018

Application Details

Location
Moanroe Ladysbridge Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
23 July 2018Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 September 2018
Grant Date
25 October 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18/5575INCOMPLETED APPLICATION18 Jun 2018

Construction of a single storey domestic dwelling, septic tank and associated site works.

Moanroe Ladysbridge Co. Cork

135m
09/4600CONDITIONAL27 Feb 2009

Construction of split-level bungalow, garage and sewage treatment unit

Garryvoe Upper Ladysbridge

149m
25/5403Conditional Permission15 Jul 2025

Permission for the following; 1) retention for window alterations on the northern extension that was granted under planning ref no. 21/7364, b) retention for all elevation alterations including front porch changed from a hipped roof to an A roof, rear kitchen lean to roof to a flat roof, window sizes changed on front, rear and side elevations, new first floor window added to northern extension, new rear door added to utility, rear ground floor window on northern extension changed to French doors, chimney removed and all associated ancillary site development works

Enniskeen Garryvoe Upper Ladysbridge Co.Cork

149m
21/7364CONDITIONAL16 Dec 2021

Construction of an extension and other alterations to their existing dwelling house as well as permission for minor demolition. The proposed development involves changes to the entire building envelop comprising an extension to the north of the site [front, side, and rear first floor extension] also involving the replacement of the roof and alterations and modifications to all external and internal finishes and the increase in existing ridge height by 1.51m to the northern part of the house. The proposed development includes rood lights, additional fenestration and glazing, cladding, boundary treatments, landscaping, drainage and all associated site development works.

Enniskeen Garryvoe Upper Ladysbridge Co Cork

150m
06/11555CONDITIONAL19 Oct 2006

Alterations and extensions to dwelling

Enniskeen Upper Garryvoe Upper Ladysbridge

185m
21/6465CONDITIONAL8 Sept 2021

Permission for retention of dwelling house as constructed, vehicular entrance as constructed and all associated site works.

Garryvoe Lower Ladysbridge Co. Cork

185m
21/6170INCOMPLETED APPLICATION5 Aug 2021

Permission for retention of dwelling house as constructed, vehicular entrance as constructed and all associated site works.

Garryvoe Lower Ladysbridge Co. Cork

210m
26/1812Grant with Conditions6 Jul 2026

The development will consist of a new proposed two storey dwelling and associated garage, opening of a new vehicular entrance to the site and wastewater treatment system and percolation area together with all associated site development works.

Garryvoe Lower, Ladysbridge, Castlemartyr, Co. Cork

279m
07/11870INCOMPLETED APPLICATION23 Oct 2007

Dwellinghouse, garage, widening of existing entrance and installation of waste water treatment system

Upper Garryvoe Ladysbridge

279m
07/10424INCOMPLETED APPLICATION21 Aug 2007

Dwellinghouse, garage and widening of existing entrance

Garryvoe Upper Ladysbridge

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?