Curragh Kanturk Co. Cork

INCOMPLETED APPLICATION

Planning application 18/5979

Cork - Cork County Council

Proposed Development

To construct a new dwelling house.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Jul 2018

  2. Decision due

    20 Sept 2018

Application Details

Location
Curragh Kanturk Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
27 July 2018
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
20 September 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18/6305WITHDRAWN31 Aug 2018

To construct a dwellinghouse

Curragh Kanturk Co. Cork

1m
17/6834WITHDRAWN2 Nov 2017

Construct a dwellinghouse

Curragh Kanturk Co.Cork

110m
10/5452INCOMPLETED APPLICATION11 Jun 2010

Retention of a partial change of use from residential use to commercial use (solicitors office) of the lower ground level (basement level) only

Egmont House Egmont Place Kanturk

110m
10/4190REFUSED3 Feb 2010

Partial change of use of existing dwelling (lower ground floor level-basement level only) from residential use to commercial use (a solicitors office)

Egmont House Egmont Place,Curragh Kanturk

110m
10/5564CONDITIONAL25 Jun 2010

Retention of partial change of use to the existing dwelling from residential use to commercial use (a solicitors office) of the lower ground level (basement level) only

Egmont House Egmont Place Curragh Kanturk

129m
26/1458Granted2 Jun 2026

Permission for The conversion of existing outhouses and main hall adjoining Egmont House, a Protected Structure (Record of Protected Structure no. 01206) to 2 no. apartments for short term letting. Permission is sought for re-instatement of archways to existing elevations within the courtyard. Works will also include alterations to elevations, the replacement of the existing roofs, new rooflights, provision of additional floor space at mezzanine level within the existing buildings, construction of walls at ground and first floor level to enclose proposed apartments, internal alterations including provision of new staircase, other works including provision of carparking, resurfacing the courtyard, bin storage and all associated site works. Extension of Duration to Permission granted under Planning Ref. No. 20/5014

Egmont House, Newmarket Road, Kanturk, Co.Cork

129m
20/5014Conditional Permission21 May 2020

The conversion of existing outhouses and main hall adjoining Egmont House, a Protected Structure (Record of Protected Structure no. 01206) to 2 no. apartments for short term letting. Permission is sought for re-instatement of archways to existing elevations within the courtyard. Works will also include alterations to elevations, the replacement of the existing roofs, new rooflights, provision of additional floor space at mezzanine level within the existing buildings, construction of walls at ground and first floor level to enclose proposed apartments, internal alterations including provision of new staircase, other works including provision of carparking, resurfacing the courtyard, bin storage and all associated site works.

Egmont House Egmont Place Curragh Kanturk, Co. Cork

149m
22/6565CONDITIONAL16 Nov 2022

Retention of the attic conversion to a habitable space, existing rooflights to front and rear of her existing dwelling house and all associated site works

No. 24 Ashdale Dun an Oir Curragh Kanturk, Co. Cork

160m
05/3677CONDITIONAL27 May 2005

Construction of two storey car showroom with ground floor showroom, workshop and valet areas and first floor offices and staff facilites, additional staff and customer parking, external car display/storage areas, totem sign, boundary fencing and all associated site works

O'Callaghans Motor Works Freemount Road Curragh Kanturk

168m
04/9746CONDITIONAL23 Dec 2004

Erection of 71 no. dwelling units comprising 55 no. dwellinghouses, 8 no. duplex units and 8 no. ground floor apartments, E.S.B. sub station and associated site works

Curragh Kanturk

The submission window has closed

Observations on this application closed on Thursday 30 August 2018, five weeks after it was received. The authority cannot accept a late submission.