← Back to search

Farranbrien East Minane Bridge Co. Cork

INCOMPLETED APPLICATION

Planning application 18/6359

Cork - Cork County Council

Proposed Development

Retention for alterations to floor plans and elevations of dwelling and site entrance from that permitted previously under planning reference no: 16/5814.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Sept 2018

  2. Decision due

    31 Oct 2018

Application Details

Location
Farranbrien East Minane Bridge Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
6 September 2018Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
31 October 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18/6721CONDITIONAL15 Oct 2018

Retention of dwelling and entrance as constructed (change of plan from the permitted previously under Planning Reference No. 16/5814)

Farranbrien East Minane Bridge Co Cork

1m
16/5814CONDITIONAL20 Jul 2016

Construction of a two storey (dormer type) dwelling, detached single storey garage, waste water treatment unit, new vehicular entrance and all associated site works.

Farranbrien East Minane Bridge Co. Cork

273m
04/5874REFUSED30 Jul 2004

Bungalow

Farranbrien East Minane Bridge

340m
23/6330CONDITIONAL22 Nov 2023

Permission to carry out construction works for the renovation of an existing uninhabitable/ruinous dwelling house. The works will include minor alterations and repairs to the dwelling house and sheds, the re-construction of shed roofs, the construction of a new entrance and driveway, the installation of a new waste water treatment system, a private well, and all other ancillary works

Farranbrien East Minane Bridge Co.Cork

341m
23/6487REFUSED13 Dec 2023

Permission for the erection of a single dwelling, new site entrance, waste water treatment system and associated site ancillary works.

Farranbrien East Minane Bridge Co Cork

342m
23/5163REFUSED8 Jun 2023

Permission to renovate an existing uninhabitable/ ruinous dwelling house, to carry out partial demolition of the existing sheds, to change the use of derelict sheds to residential use and incorporation of same into the existing dwelling house, to make alterations to the dwelling house, to construct a new entrance and driveway, to install a new waste water treatment system, to install a private well, and all other ancillary works.

Farranbrien East Minane Bridge Co. Cork

408m
23/4947INCOMPLETED APPLICATION12 May 2023

Planning permission to renovate an existing uninhabitable/ruinous dwelling house, to carry out demolition works, to change the use of derelict farm sheds to residential use, to make alterations to the dwelling house, to construct a new entrance and driveway, to install a new waste water treatment system, to install a private well and all other ancillary works.

Farranbrien East Minane Bridge Co. Cork

420m
25/4785CONDITIONAL25 Apr 2025

Permission for Retention is sought for existing standalone garden pavilion. Permission for proposed works to consist of the following: 1. demolish existing dilapidated garage and existing house extensions. 2. Remove existing container units and storage sheds. 3. Construct a new 2 storey extension and single storey garage. 4. Install a standalone sauna unit. 5. Reinstate existing single storey cottage and rear extension. 6. And carry out associated site works.

Brookly Knockmanagh Minane Bridge Co. Cork, P17DT92

420m
05/2699CONDITIONAL25 Apr 2005

Alterations, ground floor and first floor extension to single storey dwelling and installation of treatment unit

Knocknamanagh Minane Bridge

423m
20/4398CONDITIONAL26 Feb 2020

Retention of extensions to original cottage.

Knocknamanagh Minane Bridge Co. Cork

The submission window has closed

Observations on this application closed on Wednesday 10 October 2018, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?