Rossmore Quarry Barryscourt & Rossmore Townlands Carrigtohill County Cork
UNCONDITIONALPlanning application 18/6465
Cork - Cork County Council
Proposed Development
Ext. of an existing quarry over an area of 19.9ha, and the deepening of the quarry floor from the level permitted under Reg. Ref. 99/3410 to 40m below Ordnance Datum, relocation and reconfiguration of existing 38kv electricity supply pole sets that traverse the southeast of the site, and all other associated development incl. the restoration works of the final quarry void (Extractive Area) and an area of 3,8 ha to the north adjacent to the public rd. (Rd Frontage Restoration Area). The development also consists of the retention of the northern and southern quarry faces over an area of 0.872ha from the extent of the quarry faces permitted under Reg. Ref. 99/3410 at Barryscourt, Rossmore, Carrigtohill. Extension of Duration of Permission granted under Planning Reference: 03/4570.
Application Timeline
Application received
18 Sept 2018
Decision: UNCONDITIONAL
9 Nov 2018
Decision due
12 Nov 2018
Application Details
- Location
- Rossmore Quarry Barryscourt & Rossmore Townlands Carrigtohill County Cork
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 18 September 2018Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision Date
- 9 November 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of 2 no. new ESB substation & distribution room buildings and the decommissioning of an existing ESB substation and all associated site works.
Rossmore Quarry Rossmore Townland Carrigtohill County Cork
Construction of vehicular entrance to service and maintain septic tank serving existing dwelling
The Bungalow Rossmore Carrigtwohill
Dwelling
ROSSMORE, ROSSMORE,
The development consists of the continued use of the existing asphalt plant, the existing storage shed (837 sq. metres), and associated infrastructure and structures permitted under P. Ref. S/02/5476 (ABP Ref. PL04.203762); P. Ref. 14/04061; and P. Ref. 14/06489 (ABP Ref. PL04.244651) within an application area of 1.605 Hectares.
Rossmore Carrigtwohill Co. Cork
An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
Development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref. 18/6874), from 40 no. days per annum to 60 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The application site comprises an existing asphalt plant (permitted as part of overall quarry development under Cork County Council Planning Ref. No. 02/5476, and An Bórd Pleanála Ref. No. PL04.203762) The proposed development seeks to provide for the extension of opening hours of asphalt plant to allow operations on site between 0600 hours and 1900 hours Mondays to Fridays and between 0700 hours and 1600 hours on Saturdays; occasional operations outside of normal working hours up to a maximum of 40no. days per annum. The proposed development will not result in any increase in the permitted output rate of existing quarry, which will be maintained at a rate of 250000 tonnes per annum
Rossmore Carrigtwohill Co.Cork
Domestic workshop with attic space to rear of existing dwellinghouse
Rossmore Carrigtwohill
Retention of alterations to extension to dwelling
Rossmore Carrigtwohill
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?