← Back to search

119 Thomas Davis Street/Main Street Mallow Co. Cork

INCOMPLETED APPLICATION

Planning application 18/7253

Cork - Cork County Council

Proposed Development

Change of use from retail to retail, commercial and delicatessen. The development consists of cold rooms and raw meat prep at lower ground floor with revised access from the rear, ground floor commercial catering kitchen, ground floor butcher, grocers, delicatessen incorporating new shop front to the laneway for the butchers and new shop front to Main Street for the Deli. The first floor is to be storage and offices for the business. In summary, the existing uses present in the applicants current premises in no. 57 are being relocated to 119.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Dec 2018

  2. Decision due

    13 Feb 2019

Application Details

Location
119 Thomas Davis Street/Main Street Mallow Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
11 December 2018
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
13 February 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
06/55066NEW APPLICATION25 Sept 2006

a)demolition of part of retail premises and adjacent outhouses b) replacing of existing shopfront display area with new shopfront display area and associated signage c) the construction of extension to the rear of existing retail premises - the extension includes basement floor storeage use and ground and first floor retail use

119 Davis Street Mallow Co. Cork.

2m
19/4195CONDITIONAL30 Jan 2019

Change of use from consumer electronic retail and related offices and storage to retail butcher, delicatessen, catering kitchen and associated staff facilities, offices and storage. The development will consist of cold rooms and raw meat prep at lower ground floor with revised access from the rear, ground floor commercial catering kitchen, ground floor butcher, grocers and delicatessen. The first floor is to be storage and offices for the business with provision for small public events such as cookery demonstrations. Revisions to the elevations incorporating a new shop front to the laneway for the butchers, new shop front to Main St for the Deli. with a coffee hatch to the laneway for take away service. New windows to the west and skylights to the first floor and new refrigeration and extractor plant placed on the roof accessed by new stairs internally. New signage to both Main Street and the laneway in line with Conservation Area requirements. The existing laneway will be re-surfaced and graded in places to improve drainage and to provide easier access from the lane and to repair damage from construction work. In summary, the existing uses present in the applicants current premises in no. 57 are being re-located to 119.

119 Thomas Davis Street Mallow Co. Cork

12m
06/55069NEW APPLICATION2 Oct 2006

permission to construct rear extension to existing retail premises

117 Davis Street Mallow Co. Cork.

12m
09/55002CONDITIONAL27 Jan 2009

Permission for retention of internal alterations and external rear facade alterations as previously granted planning under ref. 55,069/06

Mulcahys Pharmacy 117 Davis Street Mallow

15m
24/6457CONDITIONAL19 Dec 2024

Permission for the following works: 1) alteration to shop front elevation, and all other associated site works.

Herlihy's Centra Main Street Mallow Co.Cork

16m
06/55049NEW APPLICATION21 Jun 2006

1) change of use of existing first,second and third floor areas to 5 no. apartments with new access from Davis Street and changes to existing elevations including raising the height of the existing pitched roof 2) construction of an office and staff area ancillary to the Supermarket use on the existing flat roof at the rear of the premises 3) changes to the existing rear elevation of the Supermarket and construction of unloading areas, plant and refrigeration areas and associated services and storage areas 4) putting in place of ancillary shop signage on the elevations including shop front features on the side elevation 5) modifications to existing car park boundary wall facing onto the public car park

Supervalu, Davis Street and Ball Alley Lane Mallow Co. Cork.

16m
07/55010NEW APPLICATION19 Feb 2007

Carrying out alterations to the rear goods in area of the existing Supervalu premises to include construction of an unloading platform and stairs, alterations to the plant/storage area and elevation changes

Super Valu Davis Street Mallow Co Cork

27m
05/55020NEW APPLICATION11 Mar 2005

Permission to refurbish the ground floor retail unit, 2) refurbish and convert the 1st and 2nd floor commercial units to retail and storage use respectively, 3) to replace and restore the 1st and 2 nd floor front windows to their original state and associated site works

No. 125 Davis Street Mallow, Co. Cork.

33m
23/5266WITHDRAWN21 Jun 2023

Permission to carry out works to a building in a conservation area including the removal of an ATM, to be infilled with glazing to match existing. The removal of the night safe front plate, replacing with a blank steel plate. The removal of the Ulster Bank shop front signs, the removal of Ulster Bank projecting sign and the removal of the Ulster Bank general blue signage. Carry out all internal works for the removal of the ATM as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors

Ulster Bank Limited 116 Main Street Mallow Co.Cork

33m
23/5828CONDITIONAL8 Sept 2023

The development will consist of the indefinite retention permission of external works regarding the removal of the ATM, night safe and general blue Ulster Bank signage. Planning permission required for the following: 1) Permission to carry out works for the removal of the Ulster Bank projecting sign, raised letter signs (temporarily covered up) and blue shopfront signs. 2) Permission to carry out the removal of the panelling within the ATM window, and replace with glazing and framing to match existing. 3) Permission to carry out internal works for the removal of the ATM, Loose furniture, Ulster Bank signage and merchandise on all floors.

116 Main Street Mallow Co. Cork P51FT04

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?