← Back to search

Knoppoge Td. Mallow Co. Cork

REFUSED

Planning application 19/4387

Cork - Cork County Council

Proposed Development

Retention and completion of existing re-modelled ground levels with retaining garden walls, hard surfaced area and associated landscaping to the front and side of existing Dwelling and for permission to construct a domestic garage / store for hobby use ancillary to existing dwelling and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Feb 2019

  2. Decision due

    11 Nov 2019

  3. Decision: REFUSED

    11 Nov 2019

Application Details

Location
Knoppoge Td. Mallow Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
20 February 2019Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
11 November 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

55m
21/7210REFUSED29 Nov 2021

Permission for retention of existing mobile home unit and septic tank and to remove existing septic tank and to construct a new single storey dwelling, sewerage treatment unit, percolation area and all associated site works.

Knockaroura Td and Ballyellis Td Mallow Co. Cork

106m
16/5705CONDITIONAL8 Jul 2016

Construction of dwelling and detached domestic garage, installation of treatment unit and polishing filter and carrying out all associated site works

Knoppoge Mallow Co. Cork

257m
19/5746CONDITIONAL10 Jul 2019

To construct a dwelling house to include a granny flat & for construction of a detached domestic garage with related site works.

Knoppoge Mallow Co. Cork

281m
19/6936CONDITIONAL10 Dec 2019

Permission for retention of lorry depot and vehicular parking, permission for retention for change of use from agricultural shed to workshop and vehicle store, permission for retention of extension to rear incorporating workshop and vehicle store and storage of agricultural machinery, permission for retention for change of use from sow house to power washer store and permission for retention for change of use from milking parlour to store and for permission for new parking area at the rear of site for vehicular parking and lorry depot and permission for alterations of entrance to site, all with associated site works.

Knoppoge Mallow Co. Cork

371m
06/8525REFUSED30 Jun 2006

Dwellinghouse

Knockaroura Mallow

406m
09/5777CONDITIONAL29 May 2009

Retention & completion of domestic garage to side of dwelling

Knockaroura Mallow

467m
10/8496INCOMPLETED APPLICATION17 Nov 2010

Installation of a wastewater treatment plant and percolation area

Ballyellis Mallow Co Cork

468m
10/8679INCOMPLETED APPLICATION9 Dec 2010

Installation of a wastewater treatment plant and percolation area

Ballyellis Mallow Co Cork

606m
20/6524CONDITIONAL16 Nov 2020

The construction of a new treated water storage tank comprising 1 no. 33.9m diameter single-celled precast underground concrete tank; ancillary structures comprising of 1 no. underground concrete scour chamber, 1 no. de-chlorination system and associated above-ground kiosk, and 1 no. above ground telemetry kiosk; and other ancillary development including associated underground pipework and cabling, extension to existing hard-surfaced internal circulation area, landscaping and all associated site development works.

Ballyellis Water Treatment Plant Ballyellis Mallow Co. Cork

607m
25/6943Grant with Conditions22 Dec 2025

The proposed development includes for the upgrade of the existing Mallow WTP to bring it into compliance with Uisce Éireann technical guidance documents with regards the coagulation, flocculation & clarification (CFC), filtration, chemical storage & dosing and residuals treatment processes. In addition, as part of the upgrade works it is proposed to increase the capacity of the WTP from 4,754m3/day to 5,042m3/ 22 hours. The development will consist/consists of the following: • Upgrade of the existing CFC process, including for the following: o Construction of a new flash mixing chamber with vertical turbine paddle; o Construction of a 3 no. cell flocculation stage and mixing process (Note: The provision of the new flash mixing and flocculation tank will require the relocation of existing outdoor chemical bulk storage tanks, the demolition of an existing storage building adjacent the main WTP building and the relocation of existing overhead lines.) • Pipework modifications to the existing rapid gravity filters. • Upgrade of the existing washwater residuals and sludge handling processes to ensure adequate treatment of residuals prior to river discharge and adequate storage for sludge on site, including: o 1no. new below ground equalization tank o 1no. new above ground settlement tank to be installed. o Re-purpose the existing sludge holding tank as a sludge balance tank. o 1no. picket fence thickener. o 1no. new sludge holding tank. o 2 no. pumping station kiosks, including: -sludge pumping station -sludge holding tank feed pumping station • Upgrade of the existing chemical storage arrangements including: o Installation of 1 no. outdoor Fluoride Bulk storage tank with integrated weather shrouded bund o Installation of 2 no. outdoor Poly Aluminium Chloride bulk storage tanks with integrated weather shrouded bunds o Installation of 2 no. outdoor Sodium Hydroxide bulk storage tanks with integrated weather shrouded bunds o Installation of 1no. outdoor Sodium Hypochlorite bulk storage tank. o Installation of 2 no. dedicated chemical delivery apron upon which chemical delivery vehicles shall park while unloading chemicals to the bulk storage tanks. The surface water network for the chemical delivery apron shall be able to be isolated during chemical deliveries and redirected towards a dedicated underground containment tank to capture any chemical spills. o Installation of 1no. indoor Orthophosphate bulk storage tank and bund. (Note, the existing chemical building to be modified including for replacement of 2 no. windows with a single and double door respectively). • Upgrade of the road layout to facilitate the proposed infrastructure upgrade for delivery of chemicals and sludge removal off-site. • Upgrade the surface water management for the proposed works, ensuring that the design complies with the requirements for sustainable drainage system (SuDS). • All ancillary site works including upgrade of the existing electrical, instrumentation, control & automation of the plant, diversion of existing overhead power lines and tree and hedgerow removal.

Mallow Water Treatment Plant, Ballyellis, Mallow, Co. Cork, P51 P489

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?