Ballythomas East, Ballythomas West Horsehill More North Ballyvrin Lower Dunderrow, Kinsale, Co. Cork
CONDITIONALPlanning application 19/4767
Cork - Cork County Council
Proposed Development
Expansion of the existing 6,000cu.m Firewater Retention Pond to provide a total capacity of 11,000cu.m with alterations to the existing pond as well as the construction of an extended pond area with associated site works which includes reshaping of existing berms, construction of new berms, alteration to access path on berms, site drainage layout (local to pond area) and reinstatement of site landscaping. The site currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I.209 of 2015) applies.
Application Timeline
Application received
29 Mar 2019
Decision: CONDITIONAL
10 Jul 2019
Decision due
18 Jul 2019
Grant issued
19 Aug 2019
Application Details
- Location
- Ballythomas East, Ballythomas West Horsehill More North Ballyvrin Lower Dunderrow, Kinsale, Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 29 March 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 July 2019
- Grant Date
- 19 August 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the construction of a pedestrian footbridge across an existing stream within the Eli Lilly pharmaceutical facility, and associated site works. The bridge will have a length of approx. 17.9m (13.1m span plus landing areas of 2.4m at either end) and a two-way 2.4m wide walkway and will be located on a site area of approx. 0.23ha. The application site falls within the Eli Lilly industrial complex, which operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) and is also an establishment to which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.
Eli Lilly Pharmaceutical Complex Ballythomas East & Ballythomas West Dunderrow Kinsale Co Cork
Permission for the construction of a pedestrian footbridge across an existing stream within the Eli Lily pharmaceutical facility, and associated works. The bridge will have a length of approx. 17.9m (13.1 span plus landing areas of 2.4m at either end) and a two-way 2.4m wide walkway and will be located on a site area of approx. 0.23ha. The application site falls within the Eli Lilly industrial complex, which operates under an Industrial Emissions (IE) licence (P0009-04) under part IV of the Environmental Protection Agency Act 1992 (as amended by the protection of the Environmental Act, 2003) and is also an establishment to which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies
Eli Lilly Pharmaceutical Complex Ballythomas East & Ballythomas West Dunderrow Kinsale, Co. Cork
Permission for construction of an expansion to the existing waste water treatment plant, that includes a) three number buildings consisting of i) a single storey precipitation building (8.6m high) that including an open storage area, ii) single storey electrical building (5.4m high), iii) two storey filter press building (9.6m high), b) process vessels and associated access stairs and platforms, c) structural steel service racking, d) Underground services, drainage and other associated siteworks. The proposed development is covered by an existing industrial emissions (IE) licence no. P0009-05. The development refers to a modification to an establishment to which a major accident regulation applies.
Ballythomas East, Ballythomas West Horsehill More North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
Permission for construction of an expansion to the existing waste water treatment plant, that includes (a) three number buildings consisting of (1) a single storey precipitation building (8.6m high) that including an open storage area, (2) single storey electrical building (5.4m high), (3) two storey filter press building (9.6m high), (b) process vessels and associated access stairs and platforms, (c) structural steel service racking, (d) underground services, drainage and other associated siteworks. The proposed development is covered by an existing industrial emissions (IE) licence no. P0009-05. The development refers to a modification to an establishment to which a major accident regulation applies.
Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow Kinsale, Co.Cork
The development will consist of the provision of a single-storey building extension (gross floor area of approx. 172sqm and building height of approx. 6.6m) to an existing electrical load centre building (LC7) and associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 ( as amended for the Protection of the Environment Act 2003). The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances ) Regulations 2015 (S.I.209 of 2015) applies.
in the townland of Ballythomas West within the existing Eli Lilly pharmaceutical plant at Ballythomas East, Ballythomas West, Horsehill More North and Ballyvrin Lower, Kinsale, Co. Cork, P17 NY71
Development at a site in the townland of Ballythomas West within the existing Eli Lilly pharmaceutical complex.The development will comprise of a single-storey extension to the existing Electrical Load Centre Building (LC6), of approx. 75sqm; modifications to LC6 that are required to accommodate the proposed extension, including elevational revisions to match proposed new extension; and all associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I.209 of 2015) applies.
Ballythomas West Ballythomas East,Horsehill More North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
The development will comprise of a single-storey extension to the existing Electrical Load Centre Building (LC6), of approx. 75sqm; modifications to LC6 that are required to accommodate the proposed extension, including elevational revisions to match proposed new extension; and all associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies.
Ballythomas West Ballythomas East, Horsehill North Ballyvrin Lower, Dunderrow Kinsale , Co. Cork
Development at a site in the townland of Ballythomas West within the existing Eli Lilly pharmaceutical complex. The development will comprise of a single-storey extension to the existing Electrical Load Centre Building (LC6), of approx. 75sqm; modifications to LC6 that are required to accommodate the proposed extension, including elevational revisions to match proposed new extension; and all associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I.209 of 2015) applies.
Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow Kinsale, Co. Cork
Permission to: a) Construct a new service/plant cabin, all associated site and structural works, b) Demolish an existing service/plant cabin and demolish existing associated structural works, all within their existing manufacturing facility. The proposed development is covered by an existing Industrial Emissions (IE) License no. P0009-05. The development refers to modifications to an establishment to which the Major Accidents Regulations apply.
Ballythomas East, Ballythomas West, Horse Hill More North & Ballyvrin Lower Dunderrow, Kinsale, Co. Cork
The construction of a Pharmaceutical Biotech manufacturing facility (IE43), including administration, plant and storage accommodation with a total floor area of 22,680 square metres, over three floors with intermediate service platforms and ground to eave heights from 30.150 metres high for the main manufacturing area to 11.300 metres high for ancillary areas. The proposed works shall include the construction of two separate electrical utility building; 230 square metres floor area and 148 square metres floor area, each 4.7 metres high, together with extensions to internal site service roads, a new staff car park, external plant concrete mounting pads and hard standings, and extension of an existing pipe bridge structure, partical diversion of an existing stream within the site, an entrance and the formation of landscaped berms together with new tree planting to provide enhanced visual screening.
Ballythomas East Ballythomas West Horsehill More Dunderrow, Kinsale
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?