Proposed Development

To construct 1 no. natural grass playing pitch, perimeter fencing, 6 no. floodlighting masts, the installation of floodlighting, high level ball retention nets, goalposts, a generator, dugouts and associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Apr 2019

  2. Decision due

    6 Jun 2019

Application Details

Location
Brinny Innishannon County Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
12 April 2019
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
6 June 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
19/5215CONDITIONAL14 May 2019

To construct 1 no. natural grass playing pitch, perimeter fencing, 6 no. floodlighting masts, the installation of floodlighting, high level ball retention nets, goalposts, a generator, dugouts and associated site works

Brinny Innishannon Co. Cork

2m
22/5810CONDITIONAL2 Aug 2022

Full planning permission to construct 1 no. natural grass playing pitch, perimeter fencing, 6 no. floodlighting masts, the installation of floodlighting, high level ball retention nets, goalposts, a generator, dugouts and associated site works (revised pitch levels and revised mitigation for archaeological feature from that permitted under Pl. Ref. No. 19/5215)

Brinny Innishannon Co.Cork

3m
24/5050CONDITIONAL7 Jun 2024

Permission for the installation of 8 no. floodlight to existing pitch, a generator and all site works.

Brinny Innishannon Co. Cork

53m
06/10485CONDITIONAL11 Sept 2006

Construction of 5 no. changing rooms and ancillary facilities

Brinny Innishannon

232m
21/5638CONDITIONAL11 Jun 2021

Alterations to elevations and internal modifications to the two storey dwelling house including the reduction of bedrooms from 4 to three and a single storey verandah extension to the side of the dwelling along with the conversion of an existing single storey out-building for use as a home office including raising the ridge level and adding a loft area for use as storage and associated siteworks.

Brinny House Brinny Innishannon Co. Cork

366m
23/6315Conditional Permission21 Nov 2023

The development consists of the proposed construction of a new detached dwelling house, detached garage, provision of waste water treatment unit with percolation area and all associated site works.

Rockfort Innishannon Co. Cork

386m
11/5842CONDITIONAL26 Aug 2011

Upgrade the existing Natural Gas Above Ground Installation (Planning Reg. No. 00/2251) consisting of the replacement of existing pressure reduction skid kiosk, heating system and instrumentation enclosure with two new pressure reduction skid kiosks, combined package boiler unit/instrumentation enclosure, associated underground and above ground pipework, new lighting column and ancillary works

Brinny Innishannon

389m
21/4140CONDITIONAL25 Jan 2021

The replacement of approximately 100m of existing 2.4m high chainlink fencing and associated access/emergency gates with 100m of new 2.4m high green palisade security fencing/gates and all associated site works at an existing above ground natural gas installation.

Brinny AGI (Above Ground Installation) Brinny Innishannon Co. Cork

389m
20/6432INCOMPLETED APPLICATION5 Nov 2020

The replacement of approximately 100m of existing 2.4m high chainlink fencing and associated gates with 100m of new 2.4m high green palisade security fencing/gates and all associated site works.

Brinny AGI (Above Ground Installation) Brinny Innishannon Co. Cork

389m
20/6853INCOMPLETED APPLICATION16 Dec 2020

The replacement of approximately 100m of existing 2.4m high chainlink fencing and associated gates with 100m of new 2.4m high green palisade security fencing/gates and all associated site works at an existing Above Ground Natural Gas Installation.

Brinny AGI (Above Ground Installation) Brinny Innishannon Co. Cork

The submission window has closed

Observations on this application closed on Thursday 16 May 2019, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?