← Back to search

Ballinvarrig Whitechurch Co. Cork

CONDITIONAL

Planning application 19/5217

Cork - Cork County Council

Proposed Development

Permission to construct

  1. (i)
    cubicle house with slatted tank
  2. (ii)
    silage slab and all associated site works, Retention of (i) calving shed and (ii) earth banked silage slab and Permission for demolition of out wintering pad
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 May 2019

  2. Decision due

    8 Jul 2019

  3. Decision: CONDITIONAL

    9 Jul 2019

  4. Grant issued

    5 Sept 2019

Application Details

Location
Ballinvarrig Whitechurch Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
14 May 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 July 2019
Grant Date
5 September 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

135m
23/5007CONDITIONAL17 May 2023

Construction of a dwelling and a detached domestic garage, installation of a septic tank an percolation area and carrying out all associated site works, including modifying the existing site entrance to the adjacent family home, to create a combined entrance, which will also serve the proposed dwelling

Ballinvarrig Whitechurch Co.Cork

188m
22/5588WITHDRAWN7 Jul 2022

Construction of a dwelling and a detached domestic garage, installation of a septic tank and percolation area and carrying out all associated site works

Ballinvarrig Whitechurch Co.Cork

326m
11/4023CONDITIONAL10 Jan 2011

Retention of existing domestic garage adjacent to north elevation together with permission for (a) 2 storey porch extension together with alterations to external finishes to front (west) elevation, of dwelling (b) single storey sun-room extension to side (south) elevation, (c) single storey extension to rear (east) and side (north) elevations and (d) ground floor extension to side (north) elevation providing link between dwelling and adjacent garage incorporating alterations to exsiting garage roof

Ballinvarrig Whitechurch Co Cork

432m
03/2905CONDITIONAL13 Jun 2003

Dwellinghouse

BALLINVARRIG, BALLINVARRIG,

515m
05/6225CONDITIONAL29 Aug 2005

Retention of domestic garage

Rahanisky Whitechurch

515m
03/329CONDITIONAL30 Jan 2003

Extension to bungalow

RAHANISKY, RAHANISKY,

515m
05/5292INCOMPLETED APPLICATION25 Jul 2005

Retention of domestic garage

Rahanisky Whitechurch

860m
21/6779CONDITIONAL13 Oct 2021

To construct a new front wall with vehicular entrance and all associated site works to our dwellinghouse.

Ballinvarrig Whitechurch Co. Cork

860m
21/6226WITHDRAWN11 Aug 2021

Alterations including new front wall and entrance drive and to construct a two storey extension to rear with all associated site works to dwelling house.

Ballinvarrig Whitechurch Co. Cork

865m
23/5486CONDITIONAL21 Jul 2023

A 10-year permission and 40-year operation period for a Solar Farm and underground grid connection within an overall site area of 61.08 hectares. The solar farm consists of 330,200 square meters of solar photovoltaic panels on ground mounted steel frames; on-site electrical substation; electrical skids (containing inverters, transformers and switchgear); underground power and communication cables and ducts; boundary security fencing; new internal access tracks and associated drainage infrastructure; new site entrance to the L6965 local road; 10 no. CCTV/lighting posts and all associated site services and works. The development also includes underground grid connection, which is to be installed primarily within the L6965, L2951 and L2963 public roads, this includes the installation of 3 no. underground medium voltage electrical cables, 1 no. fibre communications cable, 2 no. joint bays and associated infrastructure to allow communications and connection between the proposed 38kV on-site substation and the Kilbarry 110kV Substation, Blackpool, Cork City. The total length of the cable is c.4,449m of which c.2,021m will be within the jurisdiction of Cork County Council and c.2,428m within the jurisdiction of Cork City Council. A concurrent planning application will be lodged with Cork City Council for the remainder of the underground cable along the public roads to allow connection to the Kilbarry 110kV Substation in Blackpool, Cork City under Section 34 of the Planning and Development Act 2000 (PDA)(as amended).

Rahanisky Killeendaniel Monard Co. Cork