Proposed Development
A detached domestic garage.
Application Timeline
Application received
21 Jun 2019
Decision: CONDITIONAL
13 Jan 2020
Decision due
20 Jan 2020
Grant issued
13 Feb 2020
Application Details
- Location
- Baltydaniel East Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 June 2019Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 January 2020
- Grant Date
- 13 February 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for retention for the as built entrance walls and front boundary wall serving the dwelling house constructed under planning ref. 04/8818
Baltydaniel East Mallow Co. Cork
Dwellinghouse
Baltydaniel East Mallow
Dormer bungalow
Baltydaniel East Mallow
Dwellinghouse
Baltydaniel East Mallow
Dormer dwelling
Baltydaniel East Mallow
Permission for a change to condition number 11 of planning reference 24/6313, which required the northern site entrance to be blocked up. Permission is now being sought to keep the northern site entrance and to close the southern site entrance.
Baltydaniel East and Baltydaniel West, Mallow, Co. Cork. P51 WF9D
1) Permission for retention of the existing dwelling as constructed (change of layout and design from that previously granted under reference number 75/925). 2) Permission for retention of the attached lean-to storage area to side of dwelling. 3) Permission for decommissioning of the existing septic tank and installation of a new wastewater treatment system. 4) Permission for retention of the existing site boundaries (change to the site boundary granted under reference 75/925).
Baltydaniel East & Baltydaniel West Mallow Co.Cork
The construction of new waste water treatment plant including (a) Control building, (b) over-ground glass lined steel SBR (Sequential Batch Reactor Wastewater Treatment process) tank, (c) overground precast concrete sludge holding tank, (d) underground balance tanks, (e) underground pump sump, (f) compound fencing and gates, (g) relocation of existing containerised kiosk (to be used for the storage of equipment and bunded containers of liquid additives for use in treatment process) (h) de-commissioning of existing wastewater treatment plant and (i) all ancillary works associated with the proposed development to serve their existing manufacturing plant
Baltydaniel West and Baltydaniel East Mallow Co.Cork
Construction of an extension to the side of an existing two storey dwelling, alterations to front elevations to include new windows, the addition of 4 no. roof lights and all associated site works.
Baltydaniel West Mallow Co. Cork
Permission to: a) Demolish single storey sun room to south west elevation of the existing two storey dwelling house, b) Make minor alterations to the fenestration of the existing south east and north east elevations of the existing dwelling house, c) Construct a new single storey extension to the south west elevation of the existing two storey dwelling house, d) Construct a new single storey extension to the south east elevation of the existing two storey dwelling house, e) Install a new percolation area and all associated site works.
Baltydaniel West, Mallow, Co. Cork, P51HH39
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?