← Back to search

Gortacrue Midleton Co. Cork

INCOMPLETED APPLICATION

Planning application 19/5661

Cork - Cork County Council

Proposed Development

A two storey detached private dwellinghouse, with garage, septic tank and percolation area, and new private water well, new entrance and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Jun 2019

  2. Decision due

    22 Aug 2019

Application Details

Location
Gortacrue Midleton Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
28 June 2019
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
22 August 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
19/5889REFUSED26 Jul 2019

New two storey detached private dwelling house, with garage, septic tank and percolation area, and new private water well. New entrance and all associated site works.

Gortacrue Midleton Co. Cork

1m
20/6664WITHDRAWN27 Nov 2020

To develop a new two storey detached private dwelling house, with garage, septic tank and percolation area, new private water well, new entrance and all associated site works.

Gortacrue Midleton Co. Cork

165m
20/4107CONDITIONAL24 Jan 2020

Construction of a previously approved haybarn (Ref 19/5805) at a new location and a new tool shed, all with associated site development works and fencing and walling.

Gortacrue Midleton Co. Cork

201m
19/5805CONDITIONAL18 Jul 2019

Construction of a new stable barn building with an effluent holding tank and dungstead, a new hay barn, a horse walking ring, an extension to an existing disused shed creating a large storage shed and construction of a new hay barn shed. Permission is also sought for demolishing an existing disused shed onsite. All permissions to include all associated site development works, installation of new waste water treatment unit and percolation area, yards, site fencing and walling

Gortacrue Midleton Co. Cork

233m
19/5538INCOMPLETED APPLICATION12 Jun 2019

Construction of a new stable barn building with an effluent holding tank and dungstead, a new haybarn type 3, a new horse walking ring, an extension to an existing shed type 2. Demolish an existing shed type 1 and constructing a new shed type 3 as replacement and all associated site development works including installation of new waste water treatment unit and percolation area, yards, site fencing and walling.

Gortacrue Midleton Co. Cork

530m
06/13114CONDITIONAL8 Dec 2006

Construction of cattle shed with underground slurry tank and a silage storage area

Elfordstown Midleton

534m
25/5642Grant with Conditions15 Aug 2025

Permission for a) Extension of existing machinery storage shed to the east and extension of existing grain store to the north to incorporate a new machinery storage shed, b) Construction of a livestock shed with underground slatted slurry storage tank, c) Dung base and all associated site works.

Elfordstown Midleton Co. Cork

567m
04/8697CONDITIONAL26 Nov 2004

Dwellinghouse, Garage & waste water treatment plant

Gortacrue Midleton

606m
21/6789CONDITIONAL14 Oct 2021

3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.

Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork

608m
21/6612INCOMPLETED APPLICATION23 Sept 2021

3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.

Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?