  1. Application received

    8 Oct 2019

  2. Decision: UNCONDITIONAL

    27 Nov 2019

  3. Decision due

    2 Dec 2019

Application Details

Location
Copsetown Mallow Co. Cork
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Cork County Council

Timeline

Registration Date
8 October 2019
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
27 November 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
14/6592CONDITIONAL3 Dec 2014

Construction of dwelling house with domestic garage, wastewater treatment system and percolation area, entrance and all associated site and ancillary works

Copsetown Mallow Co.Cork

1m
24/5631Conditional Permission29 Aug 2024

Permission to construct a dwelling with domestic garage, wastewater treatment system with percolation area, entrance and all associated site and ancillary works

Copsetown Mallow Co.Cork

1m
24/5449INCOMPLETED APPLICATION29 Jul 2024

Permission to construct a dwelling house with domestic garage, waste water treatment system with percolation area, entrance and all associated site an ancillary works

Copsetown Mallow Co.Cork

180m
05/3013CONDITIONAL5 May 2005

Extensions to dwellinghouse to incorporate granny flat and conservatory

Copsetown Mallow

373m
19/6343REFUSED26 Sept 2019

Continuation of quarrying activities including the processing of aggregates, landscaping, restoration and associated works at the existing registered quarry lands (8.8 hectares). Extension of duration in accordance with planning authorisation 07/6290 (ABP ref. PL04.227565).

Copsetown Mallow County Cork

373m
07/6290CONDITIONAL20 Mar 2007

Continuation of quarrying activities including the processing of aggregates, landscaping, restoration and associated works at the existing registered quarry lands (8.8 hectares)

Copsetown Mallow

413m
10/6061REFUSED17 Aug 2010

Dwellinghouse with domestic garage, treatment unit, entrance and ancillary works

Ballybeg Mallow

413m
10/8465REFUSED16 Nov 2010

Dwellinghouse, domestic garage, treatment unit, entrance and ancillary works

Ballybeg Mallow

421m
07/9726CONDITIONAL19 Jul 2007

Construction of yard for manufacturing and storage of precast concrete blocks and other precast products, construction of storage shed, relocation of existing screening berm, demolition of boundary stone wall, relocation of boundary fence, construction of screening berm, erection of boundary fence and concrete walls, erection of light columns, installation of oil interceptor, silt trap and settlement pond, drainage works, landscaping and associated works

Copsetown Mallow

426m
15/4315CONDITIONAL18 Feb 2015

Construction of dwelling, installation of septic tank and all associated site works

Ballybeg New Twopothouse Mallow Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?